PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
219
New notices
Posted · 30d
8,887
All notice types
Awarded · 7d
1,112
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 173 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
17 Oct
—
Estimated
Closed
CF
NC
Norfolk County Council
Behaviour Support Service for Families
Health & social· Published 14 Jul
CLOSED
18 Aug
—
Estimated
Closed
CF
TT
THORNBURY TOWN COUNCIL
Landscape Architect to Redevelop the Water Play Facility at Mundy Playing Fields, Thornbury
Architecture & engineering· Published 14 Jul
CLOSED
25 Jul
£15k
Estimated
Closed
CF
NA
National Army Museum
Graphics Tender for Temporary Exhibition
Recreational & cultural· Published 14 Jul
CLOSED
04 Aug
—
Estimated
Closed
CF
I
Ingeus
Ingeus Expression of Interest - Ministry of Justice CRS Recommissioning
Financial services· Published 14 Jul
CLOSED
11 Aug
—
Estimated
Closed
CF
FT
Flitwick Town Council
Heating System Replacement for the Rufus Centre
Furniture & furnishings· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
Audio Visual and Video Conferencing 2026+
· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
RD3: Data Science, AI and Evaluation
· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
Provision of Analytics & Data Capability
· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
Provision of a service to improve organisational data literacy
· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
Provision of a data mapping service
· Published 14 Jul
CLOSED
22 Aug
£50.0m
Estimated
Closed
CF
NC
Nottinghamshire County Council
Housing Refurbishment Contract - Ashfield District Council
Construction work· Published 14 Jul
CLOSED
08 Aug
£5.0m
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
GB-Rayleigh: Transport services uk wide
Transport equipment· Published 14 Jul
CLOSED
18 Aug
£34.2m
Estimated
Closed
CF
DC
DERBY CITY COUNCIL
Drug & Alcohol Integrated Recovery-Oriented System of Care Services
Sewage & refuse· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Closed
CF
CC
Crown Commercial Service
Trade in Goods Data for Trade Remedies Authority (TRA)
Software packages· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
NE
National Employment Savings Trust (NEST)
Provision of Nest Creative Services Overflow Studio Framework
· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Closed
FTS · Supplies
SG
Scottish Government
Spare Parts for Steering Gear for MPV Jura
Transport equipment· Published 14 Jul
CLOSED
14 Jul
—
Estimated
Modification
FTS
MP
Metropolitan Police Service
Procurement of service to provide data valuation services
· Published 14 Jul
CLOSED
11 Oct
—
Estimated
Closed
CF
KH
Karbon Homes
CA16192 - Housing related ICT Systems
Real estate· Published 11 Jul
CLOSED
11 Jul
—
Estimated
Closed
FTS · Works
RB
Royal Borough of Greenwich
SPS 2685 - Supply, Installation and Maintenance of Lifts
Industrial machinery· Published 11 Jul
CLOSED
01 Aug
£50k
Estimated
Closed
CF
IW
Imperial War Museums
GB-London: Media Monitoring Service for use by Imperial War Museums
Business services· Published 11 Jul
Page 173 of 8261
PreviousNext