PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
239
New notices
Posted · 30d
10,246
All notice types
Awarded · 7d
1,249
Market signal

Notice peek

×
KI
ClosedCF · 1b45119dec0c

Brewery Turnback - ES6-8 OLE Civilis / Foundations Works

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£5.0m
Published
07 Oct 2025

Key facts

Notice ID
cf-762aa637-505a-45ca-b6be-1b45119dec0c
CPV code
45234116 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Oct 2025

Description

Brewery Turnback an enhancement scheme funded by the DfT. Formerly known as Manchester Victoria East Turnback, it has been prioritised for early development from the Central Manchester Capacity and Performance study to boost capacity and resilience. The scheme is for the design and delivery of a West facing turnback, located at Brewery Junction. At Victoria station, the through platforms also accommodate terminating trains due to an imbalance of local services to the east and west of the station. The extended time to terminate and turnback in the platforms restricts platform availability for through services. Operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during times of perturbation. The turnback is to accommodate trains up to 6 car x 26 m vehicles (DMU and EMU); with trains being able to access the turnback to and from Platforms 3-6 at Manchester Victoria station. As part of the MNTP programme, it was identified that the provision of a turnback facility to the East of Manchester Victoria Train station would provide operational flexibility. Currently, the platforms at Manchester Victoria must accommodate terminating trains, this restricts the availability of the through platforms, impacting performance and causing a timetable constraint. In a standard hour, two services, typically from Kirkby / Preston / Wigan are booked to terminate in the through platforms before the driver changes ends and the train departs in the opposite direction. Typical turnaround times are between 5-10 minutes, meaning that the platform, and route through it, remains occupied for the duration of the turnaround. The operational flexibility of the station would be improved if services could utilise a turnback facility to the East of the station. The turnback would also be a service recovery measure during perturbation. ES2-4 design and development was undertaken by WSP Limited and accepted by Network Rail. However, there are many instances within the designs where assumptions have been made stating that the TRU works would be complete prior to commencement of the project and all as built designs and source records would be available. OLE Scope of Work: The supply and installation and commissioning of new OLE foundations on the UP/ Down Rochdale Fast and on the new Turnback between Dalton Street and Miles Platting Junction (combination of piled, concrete pad, wall-mounted) This includes all hand back deliverables, such as redline drawings and attendance at AMP016 walkouts.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 181 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
03 Oct
—
Estimated
Closed
CF
CP
CRESCENT PURCHASING LIMITED
CA16139 - Preliminary Market Engagement - Supply of Agriculture, Farming, Fishing and Forestry Goods and Services
CPV 16· Published 03 Jul
CLOSED
28 Jul
£10.0m
Estimated
Closed
CF
KH
Karbon Homes
CA15927 - Furniture Supply and Services
Furniture & furnishings· Published 02 Jul
CLOSED
01 Aug
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: WAT0132-02 North Pumping Station Dock Pumps Civils
Construction work· Published 02 Jul
CLOSED
02 Jul
£60k
Estimated
Closed
CF
NE
NHS England
Improve vaccination uptake in secure and detained estate settings
Health & social· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Closed
FTS · Supplies
UO
University of Dundee
Est. of a Termed Supply & Service Agreement for Water Purification Systems and related parts etc.
Construction materials· Published 02 Jul
CLOSED
28 Jul
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4603.EFM.SW.25 Fire Alarm Remediation - Phase 1
Electrical machinery· Published 02 Jul
CLOSED
24 Jul
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1812-T-SM Domestic Ground Floor Extension - Hawthorn Close
Construction work· Published 02 Jul
CLOSED
02 Oct
—
Estimated
Closed
CF
CP
CRESCENT PURCHASING LIMITED
CA16106 - Preliminary Market Engagement - Total Facilities Management
Business services· Published 02 Jul
CLOSED
24 Jul
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1811-T-SM Domestic Ground Floor Extension - Harlington Road
Construction work· Published 02 Jul
CLOSED
23 Jul
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4602.EFM.SW.25 Two Way Radio System
Radio & TV equipment· Published 02 Jul
CLOSED
04 Aug
£750k
Estimated
Closed
CF
SC
Southend City Council
M2526-06 - REPLACEMENT OF COMPLETE DOOR ENTRY INTERCOM SYSTEM WITH IPGUARD SYSTEM - CITYWIDE
Radio & TV equipment· Published 02 Jul
CLOSED
09 Jul
—
Estimated
Closed
CF
MK
Milton Keynes College
RA351969 - MKC - Audio Visual screens
Radio & TV equipment· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Closed
FTS · Services
SE
Scotland Excel
Engineering and Technical Consultancy
Architecture & engineering· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Modification
FTS
CC
Cardiff Council
Supported Accommodation Service - PUPW YMCA
· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Modification
FTS
CC
Cardiff Council
Supported Accommodation Service - Huggard and Tressillian
· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Modification
FTS
CC
Cardiff Council
Supported Accommodation Service - Ty Gobaith
· Published 02 Jul
CLOSED
02 Jul
—
Estimated
Modification
FTS
CC
Cardiff Council
Supported Accommodation Service - Oak House Hostel
· Published 02 Jul
CLOSED
16 Jul
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: WC1383775- AK - CIDP - CIDP24- AETHER PHASE 3 URD-Inner citadel security for Airfield Ops, PSD, Cape Gata & EESA (WORKS-Phase3A) - CYPRUS
Transport equipment· Published 02 Jul
CLOSED
21 Jul
£50k
Estimated
Closed
CF
NE
NHS England
Motivations, influences and intentions to participate in NHS Cervical Screening
Health & social· Published 02 Jul
CLOSED
25 Jul
—
Estimated
Closed
CF
NL
North Lincolnshire Council
Provision of Talking Lincs Advocacy Service
Health & social· Published 02 Jul
Page 181 of 8261
PreviousNext