PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
83
New notices
Posted · 30d
7,474
All notice types
Awarded · 7d
910
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 210 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
New Years Eve Event Framework 2026-2029
· Published 23 May
CLOSED
05 Jun
—
Estimated
Closed
CF
HD
Hywel Dda University Health Board
RA350842 - Maintenance of Stress Test Systems/Cardiology Treadmills
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
Euro 2028 Fan Zones
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Over-labelled Medicines Framework
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
GL
Greater London Authority
GLA E-Counting Ballot System 2028
· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Integrated Dental Care
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Closed
CF
NL
NHS London Procurement Partnership
Wholesale Pharmaceutical Framework
Medical equipment· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
72TS Bogie Damper Overhaul Bakerloo Line Tender
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
92TS Manufacture and Supply of Body End Panels
· Published 23 May
CLOSED
09 Jun
£500k
Estimated
Closed
CF
LG
Local Government Association
GB-London: Collaborative Design of a Future Operating Model
IT services· Published 23 May
CLOSED
20 Jun
—
Estimated
Closed
CF
TW
Tunbridge Wells Borough Council
Sustainability Assessment and Strategic Flood Risk Assessment ITT
Architecture & engineering· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
TF
Transport for London
Passenger Seat Design
· Published 23 May
CLOSED
23 May
£400.0m
Estimated
Closed
CF
NC
NHS Commercial Solutions
Digital Dictation, Speech/Voice Recognition, Outsourced Transcription and associated services
Business services· Published 23 May
CLOSED
30 Jun
£155k
Estimated
Closed
CF
ES
EU SUPPLY LIMITED
HULL CITY COUNCIL- Door Access Control Improvements 2024 (Various Sites)
Construction work· Published 23 May
CLOSED
28 Apr
£157k
Estimated
Closed
CF
LC
Liverpool City Council
Everton Lifestyle Centre - Roof Repair
Construction work· Published 23 May
CLOSED
06 Jun
—
Estimated
Closed
CF
WL
West Lancashire Borough Council
Integrated Housing Management System - Request for Information
IT services· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
BL
British Library Board
002611 Supply, Delivery, Installation & On-Site Maintenance of Digitisation Scanning Equipment
· Published 23 May
CLOSED
23 May
—
Estimated
Modification
FTS
BC
BRITISH COUNCIL(THE)
UK_584- Examination Sub-Centres in the Netherlands
· Published 23 May
CLOSED
09 Jun
£50k
Estimated
Closed
CF
CC
Cambridge City Council
Cambridge City Council - Commercial kitchen for Meadows Community Centre
Furniture & furnishings· Published 23 May
CLOSED
10 Jun
£1.0m
Estimated
Closed
CF
WY
West Yorkshire Combined Authority
Batch 756 - Leeds - August 2025
Transport services· Published 22 May
Page 210 of 8261
PreviousNext