PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,306
Live opportunities
Posted · 24h
149
New notices
Posted · 30d
5,613
All notice types
Awarded · 7d
725
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,488 noticesclosed · sorted by publication date
Page 22 of 8575
Time to close
Value
Type
Buyer
Notice
CLOSED
30 Mar
—
Estimated
Closed
FTS · Services
NG
NHS Greater Glasgow and Clyde
Provision of a Community EPR System
· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
LC
Luton Council
AT1412 Buckle Close Principle Contractor
· Published 30 Mar
CLOSED
10 Apr
£40k
Estimated
Closed
CF
WL
West London NHS Trust
Market Engagement - Provision of a Safe Space/Crisis Café In Brent By North West London CAMHS Provider Collaborative (Hosted By West London NHS Trust, Contracting Authority)
Health & social· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
WA
Warrington and Halton Teaching Hospitals NHS Foundation Trust
Contract for a Hotel Venue for North West Finance Directors Conference
· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
AA
ANIMAL AND PLANT HEALTH AGENCY
Purchase of International Specialist Courier Services for APHA
· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
TF
Transport for London
Jubilee Vehicle Underframe Modification (JVUM) Lot 2 Drawgear modification - concept- design - prototype
· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
TE
The Education Training Collective
Learner Enrolment Platform - 2026
· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Closed
FTS · Services
SI
Shetland Islands Council
Janet Courtney Hostel Refurbishment, Lerwick, Shetland - Architectural Services and Principal Designer
Architecture & engineering· Published 30 Mar
CLOSED
30 Mar
—
Estimated
Modification
FTS
NE
Natural England
Soil moisture loggers
· Published 30 Mar
CLOSED
29 Apr
—
Estimated
Closed
CF
MC
Meridian Community Primary School
CA17473 - Meridian Community Primary _ Cleaning Services
Sewage & refuse· Published 27 Mar
CLOSED
24 Apr
£161k
Estimated
Closed
CF
DC
Derbyshire County Council
PRP307 (525019) Getaway Centre, 8a Dallimore Road, Ilkeston, DE7 4GZ. - Air Source Heat Pump Installation
Construction work· Published 27 Mar
CLOSED
01 Jan
—
Estimated
Closed
CF
SL
Student Loans Company
SLC TOM and Organisational Model Detailed Design Partner
Business services· Published 27 Mar
CLOSED
24 Apr
£174k
Estimated
Closed
CF
DC
Derbyshire County Council
PRP306 (525020) Ashbourne Hub and Library Compton Street, Ashbourne, DE6 1DA. - Air Source Heat Pump Installation
Construction work· Published 27 Mar
CLOSED
09 Apr
£35k
Estimated
Closed
CF
WS
West Sussex County Council
Stanhope Lodge - Cherry Tree Refurbishment (2026)
Architecture & engineering· Published 27 Mar
CLOSED
01 May
—
Estimated
Closed
CF
DF
Department for Education
DfE School Food Strategy Catering Providers Market Engagement
Food & beverages· Published 27 Mar
CLOSED
26 Apr
—
Estimated
Closed
CF
DO
Diocese of Norwich Education and Academies Trust
CA17471 - Invitation to Tender for Replacement Flat Roof Works
Construction work· Published 27 Mar
CLOSED
27 Mar
—
Estimated
Modification
FTS
TN
The National Archives
'ACCESS YOUR RECORDS' SERVICE DEVELOPMENT
· Published 27 Mar
CLOSED
10 Apr
£5.0m
Estimated
Closed
CF
SC
Sizewell C Limited
Sizewell C - HR Monitoring (CRX & Building) Package
Architecture & engineering· Published 27 Mar
CLOSED
27 Apr
£1.1bn
Estimated
Closed
CF
TC
Trafford Council
Children and Young People's Residential Placements Flexible Procurement System (Round 18)
Health & social· Published 27 Mar
CLOSED
24 Apr
—
Estimated
Closed
CF
LB
London Borough of Merton
Wimbledon Park Primary School fire safety package
Construction work· Published 27 Mar
Page 22 of 8575
PreviousNext