PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
256
New notices
Posted · 30d
9,013
All notice types
Awarded · 7d
1,139
Market signal
165,209 noticesclosed · sorted by publication date
Page 220 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
27 May
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
708422450 - Provision of Underwater Engineering Services
Repair & maintenance· Published 07 May
CLOSED
30 Apr
—
Estimated
Closed
CF
DF
Department for Work & Pensions
HHT Delivery Enablement Services
IT services· Published 07 May
CLOSED
07 May
—
Estimated
Modification
FTS
SM
Stockport Metropoliton Borough Council
Social Care Case Management
· Published 07 May
CLOSED
06 Jun
—
Estimated
Closed
CF
TH
Tullie House Museum & Art Gallery Trust
Project Tullie: Phase 3 Project Management Services Tender
IT services· Published 07 May
CLOSED
23 May
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Enterprise Space Category (ESC) Market Engagement RFI1
Transport equipment· Published 06 May
CLOSED
03 Jun
£70k
Estimated
Closed
CF
NB
Newcastle-under-Lyme Borough Council
Assessment of The Borough Council of Newcastle-under-Lyme Green Belt Land
Architecture & engineering· Published 06 May
CLOSED
27 May
—
Estimated
Closed
CF
GA
Gassco AS UK
LRF Non-Ionising Radiation Risk Assessment Services
Architecture & engineering· Published 06 May
CLOSED
16 May
—
Estimated
Closed
CF
US
UK SPACE AGENCY
UK Space Agency: Technical Assurance and Research and Development Consultancy
R&D services· Published 06 May
CLOSED
06 May
—
Estimated
Modification
FTS
NB
NHS Blood & Transplant (NHSBT)
EU Notified Body designated under Regulation (EU) 2017/746 (IVDR)
· Published 06 May
CLOSED
01 Jun
—
Estimated
Closed
CF
CC
Croft Community School
Supply and Installation of Two Demountable Buildings - Croft Community School
Construction work· Published 06 May
CLOSED
03 Mar
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Framework Contract - Supply and Installation of Curtains - Pretoria
Furniture & furnishings· Published 06 May
CLOSED
06 May
£50k
Estimated
Closed
CF
NW
nuclear waster services
PIN Peer Review of Initial Site Evaluations (ISE
R&D services· Published 06 May
CLOSED
06 May
£463k
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Sub-site Laydown Plan RIBA Stage 2 for Wyton contracts 2 and 3
Business services· Published 06 May
CLOSED
02 Jun
—
Estimated
Closed
CF
CO
City of Bradford Metropolitan District Council
Expression of Interest for: Refurbishment or Total Replacement of the existing Lift at Windsor Baths
Industrial machinery· Published 06 May
CLOSED
06 May
—
Estimated
Closed
CF
NK
North Kesteven District Council
NKDC Security Guarding Contract
Business services· Published 06 May
CLOSED
03 Jun
£70k
Estimated
Closed
CF
TP
The Police and Crime Commissioner for Derbyshire
Appliance Bay Doors At Long Eaton Fire Station
Construction materials· Published 06 May
CLOSED
23 May
£150k
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
EKFB - Vacuum Excavators - Framework Opportunity
Construction work· Published 06 May
CLOSED
06 Jun
—
Estimated
Closed
CF
SY
South Yorkshire Mayoral Combined Authority Group
Nunnery Depot Heating Replacement
Construction work· Published 06 May
CLOSED
12 May
—
Estimated
Closed
CF
TG
The Growth Company
The Growth Company EOI Department for Science, Innovation and Technology Regional Tech Booster
R&D services· Published 06 May
CLOSED
06 May
—
Estimated
Closed
CF
DH
Dover Harbour Board
POD - Specialist Design Support Framework
Architecture & engineering· Published 06 May
Page 220 of 8261
PreviousNext

Notice peek

×
BB
ClosedCF · 6542a9c1fea1

BBV Sublot 1B Tunnel Grout Treatment

Balfour Beatty VINCI JV HS2
Status
Closed
Estimated
£2.5m
Published
08 Sept 2025

Key facts

Notice ID
cf-bdf5d5a4-c383-4335-9366-6542a9c1fea1
CPV code
44831400 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    08 Sept 2025

Description

"Ground Treatment " The SC (Subcontractor) will assess the findings of the probe hole investigation and will develop the grout treatment strategy to be followed with a scope to minimize any excess water ingress during CP excavation and improve the ground stability. Grouting operations will include stage permeation grouting on max 1m steps, with the use of packers. Subcontractor based on ground and ground-water conditions as revealed from ground investigation (probe holes) shall develop the grouting strategy. The strategy will include as a minimum but not exclusively the following: • A grouting pattern of primary and secondary on the periphery of CP profile • Drilling diameter, orientation, and lengths of each grouting hole • Bottom-up grouting stages with the use of packers. The grouting stages should not exceed the length of 1m. • In case required (unstable ground) Subcontractor may need to make use of a tube a manchette TAM (sleeve pipes) system to perform the grouting. In this case the strategy should be developed accordingly. • Mix design(s) of the grout injection • Max Pressure and max Volume criteria for stopping each grouting stage • Tertiary drilling holes in case primary and secondary do not reach the target criteria. • As built records grouting locations lengths stages grout consumptions and max pressure. "

You might also see

  • All Balfour Beatty VINCI JV HS2 notices →
  • All Construction materials notices →
Open full notice ↗View in this tab