PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
188
New notices
Posted · 30d
6,998
All notice types
Awarded · 7d
901
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 239 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
08 May
£1.0m
Estimated
Closed
CF
UO
University of Leeds
GB-Leeds: 202425 4534 - Photon Counting Microscope
Laboratory equipment· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
NHS2230- The Critical List LLP 25 to 26
Health & social· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Services
LB
London Borough of Merton
Integrated Young People’s Risk and Resilience Service
· Published 04 Apr
CLOSED
25 Apr
—
Estimated
Closed
CF
UH
University Hospitals Birmingham NHS Foundation Trust
UHB Enterprise Architecture Tool Suite
Software packages· Published 04 Apr
CLOSED
31 Dec
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
FsASTC/00107 - Defence Operational Training Capability (Air) Core Systems and Services contract Voluntary Transparency Notice
Education & training· Published 04 Apr
CLOSED
29 Nov
£135k
Estimated
Closed
CF
CE
CHESHIRE EAST COUNCIL
IT Health Checks and Cyber Security Consultancy
IT services· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
NHS2228- Peninsula Anaesthetics LLP 25-26
Health & social· Published 04 Apr
CLOSED
03 May
—
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
Security services Wethersfield Braintree, Essex
Administration services· Published 04 Apr
CLOSED
02 May
£1.0m
Estimated
Closed
CF
CG
Community Gateway Association
GB-Preston: Community Gateway Association Replacement of Kitchens and Bathrooms
Construction work· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Services
CF
CalMac Ferries Limited
Framework Agreement for Marine Turbocharger Overhaul and Maintenance
Transport equipment· Published 04 Apr
CLOSED
20 Apr
—
Estimated
Closed
CF
NB
NHS Business Services Authority
W44511 RFI [Pre Proc] (CFA) Intelligent Email & Data Security Service
Software packages· Published 03 Apr
CLOSED
10 Apr
£10.0m
Estimated
Closed
CF
KC
Kilnbridge Construction Services Ltd
Fit-Out Package C4-KCSL copy
Construction materials· Published 03 Apr
CLOSED
22 Sept
£9.0m
Estimated
Closed
CF
SC
Staffordshire County Council
IA2595 - CONTRACT FOR THE PROVISION OF HAULAGE SERVICE TRANSPORTING WASTE MATERIALS FROM STAFFORDSHIRE'S HWRC TO IDENTIFIED DISPOSAL POINTS
Sewage & refuse· Published 03 Apr
CLOSED
18 Oct
£2.5m
Estimated
Closed
CF
SC
Staffordshire County Council
IA2499 - Framework Agreement for the Provision of a Treatment Service for Street Sweeping Waste
Sewage & refuse· Published 03 Apr
CLOSED
18 Apr
£50k
Estimated
Closed
CF
BH
BEDFORDSHIRE HOSPITALS NHS FOUNDATION TRUST
GB-Bedford and Luton: Temporary Air Conditioning Units - BEDSFT Hospital
Construction work· Published 03 Apr
CLOSED
03 Apr
—
Estimated
Closed
FTS · Services
UO
University of Glasgow
PURCH2085 PROVISION OF A PIVOTAL GLP PRECLINICAL SAFETY STUDY OF CELLULAR ATMP COMBINED WITH GRANULAR BONE GRAFT IN THEATRE FOR NON-UNION FRACTURE REPAIR
· Published 03 Apr
CLOSED
02 May
£115k
Estimated
Closed
CF
NT
Newark Town Council
Play Park equipment design and installation
Musical instruments· Published 03 Apr
CLOSED
01 Oct
£450
Estimated
Closed
CF
HC
Hampshire County Council
3d Digital Advertising across network for Hampshire County Council Fostering Service
Business services· Published 03 Apr
CLOSED
25 Sept
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Maintenance and Repair of Passenger and Mobility Lifts
Repair & maintenance· Published 03 Apr
CLOSED
01 May
£575k
Estimated
Closed
CF
CC
Cumberland Council
Re-wiring, Boiler, Heating and Domestic Water Replacement at Warwick Bridge Primary School, Warwick Bridge, Carlisle
Construction work· Published 03 Apr
Page 239 of 8261
PreviousNext