PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,288
Live opportunities
Posted · 24h
135
New notices
Posted · 30d
5,673
All notice types
Awarded · 7d
726
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,488 noticesclosed · sorted by publication date
Page 28 of 8575
Time to close
Value
Type
Buyer
Notice
CLOSED
18 Mar
—
Estimated
Modification
FTS
ED
East Durham College
Supply, Installation, and Maintenance of CCTV System
· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
CG
Cyngor Gwynedd
Labeli Cyfnodau Cadw - SharePoint Online / Retention Labels - SharePoint Online
· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
NM
NPL Management Limited
Supply, Deployment, and Translation of Hydrophones for Underwater Acoustic Facility
· Published 18 Mar
CLOSED
01 May
£40k
Estimated
Closed
CF
LL
LANDEX LAND BASED COLLEGES ASPIRING TO EXCELLENCE
Land-based Careers Marketing Campaign (14-19)
Agricultural products· Published 18 Mar
CLOSED
31 Mar
—
Estimated
Closed
CF
SN
STOCKPORT NHS FOUNDATION TRUST
Equipment Disposal IT 2026
Office & computing· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
SC
Salisbury City Council
Commercial Waste Collection, Disposal and Recycling Services
· Published 18 Mar
CLOSED
17 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Major repair of existing anti-radiation shelter Dolynske village, Zaporizhzhia region.
Construction work· Published 18 Mar
CLOSED
23 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Emergency transportation services
Transport services· Published 18 Mar
CLOSED
16 Apr
£500k
Estimated
Closed
CF
NN
North Norfolk District Council
GB-Cromer: PROC144 Tree Management Works
Agricultural products· Published 18 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
SB
Slough Borough Council
Installation of Cemetery Plinths
· Published 17 Mar
CLOSED
27 Apr
—
Estimated
Closed
CF
MC
Maricourt Catholic High School
CA17408 - Maricourt Catholic High School and Sixth Form Centre Tender for Cleaning Services
Sewage & refuse· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
TF
Transport for Wales Rail Limited (Utility Buyer)
Outsource Feasibility of Lost Property
· Published 17 Mar
CLOSED
09 Apr
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Webbs Hole Pumping Station Responsive and Planned Maintenance
Construction work· Published 17 Mar
CLOSED
06 May
—
Estimated
Closed
CF
DO
Diocese of Norwich Education and Academies Trust
CA17403 - Invitation to tender for cleaning contract at The Bishop's Primary Academy
Sewage & refuse· Published 17 Mar
CLOSED
27 Mar
—
Estimated
Closed
CF
TW
The West of England Combined Authority
Underground Assets Data Transformation & Commercialisation
Radio & TV equipment· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
BG
Borden Grammar School
Borden Grammar School - Cleaning Tender
· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
SC
Sunderland City Council
Minor Works Framework
· Published 17 Mar
CLOSED
06 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Medical equipment
Medical equipment· Published 17 Mar
CLOSED
07 Apr
£200k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of One Size Fits All Yellow Security Vest
Clothing & footwear· Published 17 Mar
CLOSED
16 Apr
—
Estimated
Closed
CF
KM
KBS Maritime Ltd
Thunderer Workshop PV & Ship Halls PV
Petroleum & fuel· Published 17 Mar
Page 28 of 8575
PreviousNext