PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
268
New notices
Posted · 30d
13,251
All notice types
Awarded · 7d
1,709
Market signal

Notice peek

×
KT
ClosedCF · c50361b9fec8

Manchester International Airport - Temporary Works Piling Enabling Works

Kier Transportation - CP7 NWC
Status
Closed
Estimated
£500k
Published
10 Feb 2026

Key facts

Notice ID
cf-22a58595-1e7e-45f7-8219-c50361b9fec8
CPV code
44212400 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Feb 2026

Description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The piling mat location along S2 and S1 walls will need to be installed to accommodate the arrival of the SF95 CFA piling rigs. The excavation of material and installation of temporary works for the pile mats will be on 3rd party land belonging to the Clayton Hotel and MAG. - Clayton Hotel Wall Removal/Relocation and Reinstatement upon completion. - Remove Fencing - Piling Mat Installation (S1 134m, S2 194m) - Screw Piles - Stone up the area adjacent to the UU area (already deveged) - Install Railway access steps

You might also see

  • All Kier Transportation - CP7 NWC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,540 noticesclosed · sorted by publication date
Page 29 of 8577
Time to close
Value
Type
Buyer
Notice
CLOSED
17 Mar
—
Estimated
Modification
FTS
BG
Borden Grammar School
Borden Grammar School - Cleaning Tender
· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
SC
Sunderland City Council
Minor Works Framework
· Published 17 Mar
CLOSED
06 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Medical equipment
Medical equipment· Published 17 Mar
CLOSED
07 Apr
£200k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of One Size Fits All Yellow Security Vest
Clothing & footwear· Published 17 Mar
CLOSED
16 Apr
—
Estimated
Closed
CF
KM
KBS Maritime Ltd
Thunderer Workshop PV & Ship Halls PV
Petroleum & fuel· Published 17 Mar
CLOSED
27 Mar
—
Estimated
Closed
CF
DF
Department for Education
Renewal and Retrofit Programme (previously advertised as DfE Education Estates Programme)
Construction work· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Closed
FTS · Services
SP
Sussex Partnership NHS Foundation Trust
GP Support - Courtyard Surgery input to 78 Crawley Road
· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
RB
Redditch Borough Council
Tree Survey, Asset Register and Zoning Exercise
· Published 17 Mar
CLOSED
20 Apr
—
Estimated
Closed
CF
RS
ROYAL SOCIETY FOR THE PROTECTION OF BIRDS
Downs to the Sea and Improving Pulborough and Amberley Projects at RSPB Pulborough Brooks
Construction work· Published 17 Mar
CLOSED
17 Apr
—
Estimated
Closed
CF
DC
DERBY CITY COUNCIL
TD2331 - Family Based Community Support service to help families and care leavers who may have multiple or complex needs
Health & social· Published 17 Mar
CLOSED
17 Mar
—
Estimated
Modification
FTS
GT
Govia Thameslink Railway Limited
Industrial Doors , Maintenance, Overhaul and New Installations
· Published 17 Mar
CLOSED
01 Apr
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of a crawler bulldozer and a truck-mounted aerial platform
Transport equipment· Published 17 Mar
CLOSED
16 Mar
—
Estimated
Modification
FTS
TF
Transport for London
Plant Cables and Accessories Framework
· Published 16 Mar
CLOSED
27 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence
Boeing Defence UK Cluster Training Programme 2026
Transport equipment· Published 16 Mar
CLOSED
17 Apr
£100k
Estimated
Closed
CF
BH
Broadland Housing Association
GB-Norwich: 26-006 - The Lawns Communal Electrical Rewire
Construction work· Published 16 Mar
CLOSED
17 Apr
£25.0m
Estimated
Closed
CF
WS
West Sussex County Council
Traffic Signals 2026
Repair & maintenance· Published 16 Mar
CLOSED
09 Apr
—
Estimated
Closed
CF
CO
City of Wolverhampton College
CA17383 - City of Wolverhampton College Mechanical & Electrical Services
Repair & maintenance· Published 16 Mar
CLOSED
16 Mar
—
Estimated
Modification
FTS
NC
Nottingham City Council
Supply of Building Materials
· Published 16 Mar
CLOSED
03 Apr
£4.0m
Estimated
Closed
CF
CC
Cornwall College
CORNWALL COLLEGE - PENHALIGON BUILDING RAAC ROOF REMOVAL
Construction work· Published 16 Mar
CLOSED
16 Mar
—
Estimated
Modification
FTS
AH
Anchor Hanover Group
Supply of Fresh Meat, Dairy, Bakery, Frozen Fish and Fresh Produce
· Published 16 Mar
Page 29 of 8577
PreviousNext