PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
164
New notices
Posted · 30d
7,129
All notice types
Awarded · 7d
906
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 296 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
29 Jan
£761k
Estimated
Closed
CF
BP
Bedfordshire Police, Essex Police, Kent Police, Cambridgeshire Constabulary, Hertforshire Constabulary, Norfolk Constabulary, Suffolk Constabulary
Airbox Mosiac (PDS SSAS)
IT services· Published 20 Feb
CLOSED
24 Mar
£1.2m
Estimated
Closed
CF
HC
Hampshire County Council
Greenwood School Online Learning Provision
Education & training· Published 20 Feb
CLOSED
28 Mar
£900k
Estimated
Closed
CF
SM
Science Museum Group
Historic Object Asbestos Framework 2025
Construction work· Published 20 Feb
CLOSED
21 Mar
£130k
Estimated
Closed
CF
CO
City of London Corporation
Stock Condition Survey
Architecture & engineering· Published 20 Feb
CLOSED
10 Mar
—
Estimated
Closed
CF
SC
Sheffield City Council
Central Library & Graves Gallery Feasibility Project
Business services· Published 20 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Counter Uncrewed Aerial Systems (C-UAS) Exposition - RFI
Security & defence· Published 20 Feb
CLOSED
14 May
—
Estimated
Closed
CF
CH
Communities & Housing Investment Consortium Ltd (CHIC)
CHIC Multiple Elements of the Built Environment Framework [2025-2029]
Construction materials· Published 20 Feb
CLOSED
24 Mar
—
Estimated
Closed
CF
MB
Maidstone Borough Council
MBC Maidstone East Development
Construction work· Published 20 Feb
CLOSED
20 Feb
—
Estimated
Closed
FTS · Supplies
UO
University of Glasgow
PURCH2394 Provision Of Framework Agreement For A 3d Singe Cell Multi-Omic Laser
· Published 20 Feb
CLOSED
21 Feb
£50k
Estimated
Closed
CF
NH
Newlon Housing Trust
GB-London: Concierge Services
Repair & maintenance· Published 20 Feb
CLOSED
01 Jun
£56.6m
Estimated
Closed
CF
BB
Bedford Borough Council
The Supply of Electric Vehicle Charging Infrastructure and Associated Services 2025-2040
Construction work· Published 20 Feb
CLOSED
09 Apr
£3.6bn
Estimated
Closed
CF
WC
Warwickshire County Council
WCC - Home Care Services
Health & social· Published 20 Feb
CLOSED
26 Feb
—
Estimated
Closed
CF
SC
SKANSKA CONSTRUCTION UK LIMITED
Soil Quality Monitoring
Mining & minerals· Published 20 Feb
CLOSED
20 Mar
£800k
Estimated
Closed
CF
NC
Newcastle City Council
Paint Pack Supply
Construction materials· Published 20 Feb
CLOSED
31 Mar
—
Estimated
Closed
CF
FC
Foreign Commonwealth and Development Office
Asia Pacific Regional Benefits Manager (APAC RBM)
Financial services· Published 20 Feb
CLOSED
20 Feb
—
Estimated
Closed
FTS · Services
UR
UK Research & Innovation
The Provision of Patent and Trademark Attorney Services
· Published 20 Feb
CLOSED
17 Feb
—
Estimated
Closed
CF
UR
UK Research & Innovation
The Provision of Patent and Trademark Attorney Services
Business services· Published 20 Feb
CLOSED
28 Mar
—
Estimated
Closed
CF
UO
UNIVERSITY OF DERBY
Fire Door Inspections & Remedial works
Construction materials· Published 20 Feb
CLOSED
17 Apr
—
Estimated
Closed
CF
WC
Wiltshire Council
CS1966 District Specialist Centre (DSC) Windmill Hill, Tidworth
Education & training· Published 20 Feb
CLOSED
22 Apr
—
Estimated
Closed
CF
EP
EN Procure Ltd
DPS for Compliance Works (2025)
Construction work· Published 20 Feb
Page 296 of 8261
PreviousNext