PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
167
New notices
Posted · 30d
6,929
All notice types
Awarded · 7d
884
Market signal

Notice peek

×
CG
ClosedCF · 471b6e26cea4

P23 Tunnel Fire Main System Design - Costain HRS02 Tunnel and Lineside M&E

Costain Group PLC
Status
Closed
Estimated
£500k
Published
20 Oct 2025

Key facts

Notice ID
cf-6ea095b0-f5bd-44b7-9723-471b6e26cea4
CPV code
44482000 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Oct 2025

Description

Costain have been appointed to deliver contract HRS02, the Tunnel and Lineside Mechanical and Electrical services for HS2 ltd. A high-speed railway project that connects London to Birmingham with plans to extend in the future. The HS2 project has 14no dual bore tunnels each of which has a fire main through the length of each bore - totalling approximately 111km of fire main. The tunnel fire mains are connected to falling mains from the various shaft buildings (13no) at intermediate points within the tunnels, and to portal areas at the start/end of each tunnel. Package P23 Tunnel System Fire Main Design scope is for the full design of the tunnel fire main system, including validation and co-ordination of the design already completed by other (Main works civils contractors) who are fitting out the fire main in the shaft and portal areas. Costain require a specialist designer to take the client's performance brief for this system and produce the design to enable construction, testing, commissioning, assurance and handover. Costain and HS2 are looking for innovative and smart solutions that provide benefits in the following key areas. -Health and Safety -Programme - Installation and Commissioning activities -Cost -Quality and Assurance Efficiency -Whole Life Cost -Carbon Efficiency The design development and any innovations must be accompanied with a rigorous approach to ensure that the technical requirements are met. The scope of design will include (but not be limited to) the following: Calculations for pipework sizing and specification including computation fluid dynamics Analysis of stress, expansion, thrust considerations and incorporation into the design Design of bracketry supports, anchors and associate fixings within the tunnel Production of BIM model and drawings outlining the spatial layout and co-ordination of the fire main Co-ordination with other services design, including but not limited to tunnel civils, handrail and bracketry design Support to Costain's overall M&E design partner through concept and detailed design Full details of the scope and project brief/specifications will be provided to the successfully shortlisted suppliers at the next procurement stage. Suppliers should be aware of the scale of the HS2 project and are to assess their internal capabilities to be able to carry out the intended scope of works prior to completing the expression of interest.

You might also see

  • All Costain Group PLC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 309 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
05 Mar
£30k
Estimated
Closed
CF
YD
Yorkshire Dales National Park Authority
INVITATION TO QUOTE FOR ECONOMIC BUSINESS CASE FOR THE PROPOSED ACTIVE TRAVEL NETWORK IN THE YORKSHIRE DALES NATIONAL PARK & THE PEAK DISTRICT NATIONAL PARK
Business services· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Leuchars External Refurbishments to 54 properties - FY2025/26 - Amey North Region - Scotland
Construction work· Published 18 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
LC
Low Carbon Contracts Company Ltd
Modelling Review Consultancy
Architecture & engineering· Published 18 Feb
CLOSED
18 Mar
£175k
Estimated
Closed
CF
WO
West Oxfordshire District Council
Landlords Enabling Works at Unit 6 Marriotts Walk Witney
Construction work· Published 18 Feb
CLOSED
20 Mar
£400k
Estimated
Closed
CF
SM
Sandwell Metropolitan Borough Council
Tender for Stabilisation of Shallow Mine workings at the Location of High Bullen Car Park, Wednesbury
Construction work· Published 18 Feb
CLOSED
18 Apr
—
Estimated
Closed
CF
TP
The Piggott School
The Piggott School ~ Catering Tender
Hotel & restaurant· Published 18 Feb
CLOSED
17 Mar
£83k
Estimated
Closed
CF
SM
Stockport Metropoliton Borough Council
AutoCAD Licenses and Support - Stockport MBC
Software packages· Published 18 Feb
CLOSED
21 Mar
£140k
Estimated
Closed
CF
RB
Rossendale Borough Council
Invitation to design, supply and install a new junior play area at Whitaker Park, Rawtenstall
Musical instruments· Published 18 Feb
CLOSED
19 Mar
—
Estimated
Closed
CF
FS
Food Standards Agency
Parliamentary Monitoring 2025
Business services· Published 18 Feb
CLOSED
24 Mar
£367k
Estimated
Closed
CF
SC
Suffolk County Council
Bereavement by Suicide Community Support Service
Health & social· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Wittering External Refurbishments to 66 properties - FY2025/26 - Amey Central Region - East Midlands & Nth
Construction work· Published 18 Feb
CLOSED
28 Feb
£21k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA15346 - RFQ 2024/34 - Tree Planting Works District Wide in Parks & Amenity Locations
Agriculture & forestry· Published 18 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
UO
University of Bath
Versatile Ultra-High Speed Camera
Laboratory equipment· Published 18 Feb
CLOSED
20 Mar
—
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Mechanical and Electrical Services
Architecture & engineering· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Wittering External Refurbishments to 45 properties - FY2025/26 - Amey Central Region - East Midlands & Nth
Construction work· Published 18 Feb
CLOSED
14 Apr
£396k
Estimated
Closed
CF
SC
Suffolk County Council
Catering Services for Melton Primary School
Hotel & restaurant· Published 18 Feb
CLOSED
20 Mar
£150k
Estimated
Closed
CF
BP
Bedfordshire Police; Cambridgeshire Constabulary; Hertfordshire Constabulary
Custody Laundry Service - BCH
Other services· Published 18 Feb
CLOSED
19 Mar
—
Estimated
Closed
CF
SC
Sunderland City Council
First Tier Level: Welfare Rights & Financial Wellbeing Advice
Health & social· Published 18 Feb
CLOSED
21 Mar
£400k
Estimated
Closed
CF
SM
Science Museum Group
L2 Hangar Door Replacement
Construction work· Published 18 Feb
CLOSED
25 Mar
£19.5m
Estimated
Closed
CF
NE
NHS England
NHS National Generic Pharmaceuticals - Clozapine
Medical equipment· Published 18 Feb
Page 309 of 8261
PreviousNext