PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
83
New notices
Posted · 30d
7,474
All notice types
Awarded · 7d
910
Market signal

Notice peek

×
BB
ClosedCF · 3e7ff942bcfd

Fit Out - Primary Steel Framework, Steel Sub Frames, Cladding Track, Firestops, Insulation, Retail Doors and Glazing -WP12.4.1 - Old Oak Common (S4) Station

Balfour Beatty VINCI Systra JV
Status
Closed
Estimated
£10.0m
Published
07 Feb 2025

Key facts

Notice ID
cf-86b23a2a-e291-4791-aba5-3e7ff942bcfd
CPV code
45262670 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    07 Feb 2025

Description

WP12.4.1 - Installation of primary steel framework, installation of steel sub frames, cladding tracking systems, firestops, insulation, retail doors and glazing panels for retail units within the station SAB areas. 1.1.1.1 Scope: For a Subcontractor to fabricate, manufacture, and install fibre cement cladding, internal glazing and smoke downstands, and all internal structural steelwork to support the internal cladding and glazing scope to front of house and station concourse areas. The scope also to include overclad doors, skirtings trims and architectural finished louvres. Note the HS2 station internal artwork cladding panels provided by others. 1.1.1.2 The Contractor will issue a detailed design for pricing as part of the Invitation to Tender. The Subcontractor will develop the design and coordinate the interfaces of the works, ensuring it is compliant and accepted by the Project Manager prior to commencement of works. 1.1.1.3 It's anticipated the site works will commence in mid 2027 and are likely to finish end of 2030. Key materials for the Subcontractor to fabricate, manufacture and install: 1.1.1.4 Bespoke designed steel frame curtain walling system with fixed units, steel frame curtain walling system with single glazed fixed panels - 172m2. 1.1.1.5 Bespoke fabricated single glazed stick façade system, steel frame curtain walling system with clear faced single glazed units; glazed framed doors and opaque bulkhead infill panels - 577m2. 1.1.1.6 overall size 2000 x 2500mm high; double leaf doors - 10No. 1.1.1.7 Fire stops to the ceiling level - Approximately 720m. 1.1.1.8 Bespoke designed internal steel frame system, with fire rating and acoustic requirements incorporating a combination of clear and back painted fixed single-glazed units - 466m2. 1.1.1.9 Bespoke fabricated double-glazed system with insulated panels steel frame system with glazed facade system; double glazed fixed panels - 171m2. 1.1.1.10 Bespoke fabricated double-glazed system, steel frame system with glazed facade system; double glazed fixed panels - 97m2. 1.1.1.11 Fibre cement cladding lining with stainless steel trims and stainless-steel portal frame, supported by bracketry and rails which shall be fixed back to the vertical posts - 424m2. 1.1.1.12 Metal Cladding Lining, steel panels to form a rainscreen system shall be supported by bracketry and rails, including supply and install of vertical posts - 1353m2. 1.1.1.13 Installation of approximately 760m of ceiling firestopping. 1.1.1.14 Installation of 35No double leaf doors, fixings, door jambs and headers. 1.1.1.15 Installation of louvers, glazing manifestations, skirting, roller blinds, concertina smoke screen and down stands. NOTE: LIN-271 is the vitreous enamel art cladding panels, this does not form part of this scope. Further details can be found on the attached document

You might also see

  • All Balfour Beatty VINCI Systra JV notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 31 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
19 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
SUPPLY CHAIN NOTICE - Central Substation RIBA4 & Build
Construction work· Published 19 Mar
CLOSED
19 Mar
—
Estimated
Modification
FTS
HC
Hertfordshire County Council
HCC Dec 25 - A Contract for the Provision of Measured Term Contract Mechanical and Electrical, Planned, Reactive and Minor Works
· Published 19 Mar
CLOSED
19 Mar
£870k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Rosyth External Refurbishments to 26 properties - FY2026/27 - Amey North Region - Scotland
Construction work· Published 19 Mar
CLOSED
24 Apr
—
Estimated
Closed
CF
HR
Harrow, Richmond & Uxbridge Colleges
CA17419 - Harrow Richmond & Uxbridge College - ICT Managed Service Partner Procurement
IT services· Published 19 Mar
CLOSED
19 Mar
—
Estimated
Modification
FTS
FF
FAIR4ALL FINANCE LIMITED
Home Contents Pilot: Proposition Design Support
· Published 19 Mar
CLOSED
19 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
SUPPLY CHAIN NOTICE_Thunderer Workshop PV & Ship Halls PV
Petroleum & fuel· Published 19 Mar
CLOSED
31 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
REQUEST FOR INFORMATION - PROJECT HORUS
Security & defence· Published 19 Mar
CLOSED
17 Apr
£500k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Mobile Operating Table, Accessories & Patient Positioning Devices
Medical equipment· Published 19 Mar
CLOSED
19 Mar
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
BLD0323-02 03 Fire Strategies Phase 2 & 3
Architecture & engineering· Published 19 Mar
CLOSED
19 Mar
—
Estimated
Modification
FTS
TF
Transport for London
BAU Pan Fleet Bespoke Plastic, Rubber and Composite Components
· Published 19 Mar
CLOSED
27 Mar
£300k
Estimated
Closed
CF
WL
West London College
West London College student computers
Office & computing· Published 18 Mar
CLOSED
03 Apr
£5.0m
Estimated
Closed
CF
EK
Eiffage Kier JV HS2 Main Civils Works, Lots C2 & C3
Noise Barrier Specialist Bolts and Fixings
Construction materials· Published 18 Mar
CLOSED
17 Apr
£1.0m
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply, Installation and Support of High-Fidelity Clinical Simulation Manikins and Training Services
Medical equipment· Published 18 Mar
CLOSED
01 Apr
£15k
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Specialist Consultancy - Review and Impact Assessment of Railway Survey Standard
Construction work· Published 18 Mar
CLOSED
10 Apr
—
Estimated
Closed
CF
HR
Harrow, Richmond & Uxbridge Colleges
CA17415 - Harrow Richmond and Uxbridge College (HRUC) - Staff Benefits Platform
Software packages· Published 18 Mar
CLOSED
17 Apr
£600k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Shrike Batteries & Charger
Security & defence· Published 18 Mar
CLOSED
17 Apr
£300k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of 3 in 1 Hi Vis
Clothing & footwear· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
ED
East Durham College
Supply, Installation, and Maintenance of CCTV System
· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
CG
Cyngor Gwynedd
Labeli Cyfnodau Cadw - SharePoint Online / Retention Labels - SharePoint Online
· Published 18 Mar
CLOSED
18 Mar
—
Estimated
Modification
FTS
NM
NPL Management Limited
Supply, Deployment, and Translation of Hydrophones for Underwater Acoustic Facility
· Published 18 Mar
Page 31 of 8261
PreviousNext