PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
131
New notices
Posted · 30d
6,376
All notice types
Awarded · 7d
803
Market signal

Notice peek

×
MO
ClosedCF · e0f780122190

WC1167436 - Construction of 3No. New masts to replace existing masts on TCI antenna in SLS, Akrotiri

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
10 Jan 2025

Key facts

Notice ID
cf-970fbe1c-696c-44ce-9fc4-e0f780122190
CPV code
44212250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Jan 2025

Description

The scope of works involves replacing the existing TCI masts with new ones, including the replacement of guy wire anchors and associated rigging accessories, as well as the installation of bird flight deflectors. The foundations for both the masts and the guy wires have already been completed as part of a separate project. The successful contractor will be required to install the towers and guy wires in accordance with the provided drawings and specifications. The TCI antenna system comprises of three guyed steel masts (MT0079, MT0080, and MT0081) located at the Salt Lake Site (West Site) in the RAF Akrotiri area, Cyprus. These masts were originally constructed circa 1997. The Salt Lake Site is a wetland in close proximity to the seafront of Akrotiri Bay, covering an area of approximately 10.65 km². It is divided into the West, Lizard, and Sandra Sites. The TCI antenna system, including the three masts in question, is located at the West Site of the Salt Lake. Table 1: List of masts included in the project S/N Location Asset No. Asset Description Asset Height (m) 1 Akrotiri MT0079 TCI - Steel lattice mast 45.7 2 Akrotiri MT0080 TCI - Steel lattice mast 45.7 3 Akrotiri MT0081 TCI - Steel lattice mast 11.0 The two taller masts are guyed steel lattice structures, each standing 45 meters high. The width and height of the lattice sections are 61cm. Each tower's three legs are composed of circular hollow sections (CHS) with a diameter of 57.2mm and a wall thickness of 2.66mm. The horizontal and diagonal bracings are also made of CHS members, measuring 25.4 mm in diameter with a wall thickness of 1.52mm. The bracing tubes have flattened ends with bolt holes for connection to the vertical CHS legs. The third mast is a guyed steel lattice structure standing 11 meters high. The width and height of the lattice sections are 49 cm. The tower's three legs are composed of CHS with a diameter of 38.1mm and a wall thickness of 1.90mm. The horizontal and diagonal bracings are also made of CHS members, measuring 19.05mm in diameter with a wall thickness of 1.52mm. The bracing tubes also have flattened ends with bolt holes for connection to the vertical CHS legs. The existing masts need to be demolished and reconstructed in accordance with the new design drawings and specifications. Please note that the project must be completed within a fixed period of approximately 4 weeks. This timeframe is non-negotiable, and no work will be allowed outside of the specified period. The contractor must allocate adequate resources to ensure the project is completed within this timeframe. The Provisional Key Tender dates for the project are as follows: · Issue of Tender Documents: Monday 27th January 2025. · Tender return date: Friday 28th February 2025. · Contract award date: Friday 04th April 2025. · Commencement of work onsite: Monday 01st September 2025. · Completion of Work: Friday 26th September 2025. The currency of this project is Euro (€)

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 447 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
17 Jan
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: LE TacCIS Programme and TacSys Service Executive Industry Day
Security & defence· Published 20 Dec
CLOSED
23 Jan
—
Estimated
Closed
CF
FA
Future Academies
Future Academies - Construction Project Management Services
Architecture & engineering· Published 20 Dec
CLOSED
21 Feb
£600k
Estimated
Closed
CF
UO
University of Hertfordshire
Removals Services - 2025
Business services· Published 20 Dec
CLOSED
03 Jan
—
Estimated
Closed
CF
BG
Bernicia Group
Flooring Supply and Installation - Berwick-upon-Tweed
Furniture & furnishings· Published 20 Dec
CLOSED
31 Jan
—
Estimated
Closed
CF
EC
Essex County Council
Live at Home 2025
Health & social· Published 20 Dec
CLOSED
20 Jan
£135k
Estimated
Closed
CF
HE
Historic England
Building Repairs at Fort Cumberland
Construction work· Published 20 Dec
CLOSED
24 Jan
—
Estimated
Closed
CF
BL
British Library Board
002505 Shared Repository Service
IT services· Published 20 Dec
CLOSED
21 Jan
—
Estimated
Closed
CF
TV
Tees Valley Combined Authority Group, and Teesside International Airport
TVCA-PROC-0482 Pre-Tender Market Engagement - Freeport Digital Testbed Modular Build
Construction materials· Published 20 Dec
CLOSED
10 Jan
£150k
Estimated
Closed
CF
RD
Rotherham, Doncaster and South Humber NHS FT
For the Provision of a Crisis House Service in Rotherham
Health & social· Published 20 Dec
CLOSED
17 Jan
—
Estimated
Closed
CF
NH
National Highways
Roadside Diagnostic Device Tester (RDDT)
Software packages· Published 20 Dec
CLOSED
31 Jan
—
Estimated
Closed
CF
NC
NHS Commercial Solutions
Opportunity Notice - Modular & Prefabricated Building Solutions and Associated Services
Construction materials· Published 20 Dec
CLOSED
26 Feb
£1.5m
Estimated
Closed
CF
NC
Nottingham City Council
CPU 4422 Lift and Disabled Access Equipment Maintenance & Repair including LOLER
Architecture & engineering· Published 20 Dec
CLOSED
24 Jan
£5.0m
Estimated
Closed
CF
LL
LONDON LUTON AIRPORT LIMITED
L24098-T-LH RETENDER Multi Category open retail tender: Unit 34
Hotel & restaurant· Published 20 Dec
CLOSED
24 Jan
£1.6m
Estimated
Closed
CF
UC
University College London Hospitals NHS Foundation Trust
UCLH-6593 - External Audit
Business services· Published 20 Dec
CLOSED
30 Jan
£460k
Estimated
Closed
CF
TH
Tower Hamlets
HAC6050: Adult Weight Management Tier 2 (Specialist)
Health & social· Published 20 Dec
CLOSED
24 Jan
£5.0m
Estimated
Closed
CF
LL
LONDON LUTON AIRPORT LIMITED
L24103-T-LH RETENDER Multi Category open retail tender: Unit 25b - excluding F&B
Hotel & restaurant· Published 20 Dec
CLOSED
13 Feb
£280k
Estimated
Closed
CF
HC
Hull City Council
Costello Stadium Athletic Track Refurbishment
Recreational & cultural· Published 20 Dec
CLOSED
31 Jan
—
Estimated
Closed
CF
TA
Tonbridge and Malling Borough Council
TMBC Email and Web Security Solution Supplier Engagement
Software packages· Published 20 Dec
CLOSED
15 Jan
£20.0m
Estimated
Closed
CF
BC
Bristol City Council
GR/HGW/Bristol Avon Flood Strategy Multi-Disciplinary Consultancy Services
Construction work· Published 20 Dec
CLOSED
07 Feb
—
Estimated
Closed
CF
V
VIVID
VIVID - Responsive Roofing Repairs
Construction work· Published 20 Dec
Page 447 of 8261
PreviousNext