PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,260
Live opportunities
Posted · 24h
172
New notices
Posted · 30d
5,864
All notice types
Awarded · 7d
765
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,355 noticesclosed · sorted by publication date
Page 46 of 8568
Time to close
Value
Type
Buyer
Notice
CLOSED
20 Mar
—
Estimated
Closed
CF
TC
The Co-operative Academy of Manchester
CA17220 - Co-op Academy Swinton - new 3-G pitch required
Construction work· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
OB
Oxford Brookes University
Website Content Management System Replacement Project, Student App and Staff Intranet Project
· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
UA
UK Atomic Energy Authority
33kV Substation SCADA Supply
· Published 17 Feb
CLOSED
04 Mar
—
Estimated
Closed
CF
DF
Department for Education
Best Start Free Breakfast Clubs Enrichment Sponsorship Academic Year 26/27
Musical instruments· Published 17 Feb
CLOSED
04 Mar
£1.0m
Estimated
Closed
CF
WY
West Yorkshire Combined Authority
Batch 757 - Bradford May 2026
Transport services· Published 17 Feb
CLOSED
18 Mar
—
Estimated
Closed
CF
CP
CRESCENT PURCHASING LIMITED
CA17224 - Electronic Payment Methods
Software packages· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
HF
Harris Federation
Harris Federation Lettings Requirement for Five Academy Schools (individual Lots)
· Published 17 Feb
CLOSED
20 Mar
—
Estimated
Closed
CF
RT
Rugeley Town Council
Rugeley Town Council - Supply of Christmas Lights and associated works for a 3-year contract
Electrical machinery· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
YS
York St John University
ITT for the Provision of HVAC (heating, ventilation and air conditioning) and PPM (Planned Preventative Maintenance) Services to York St John University
· Published 17 Feb
CLOSED
17 Feb
£870k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Leeming External Refurbishments to 33 properties - FY2026/27 - Amey North Region - Northern England
Construction work· Published 17 Feb
CLOSED
30 Mar
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Reinstatement Evaluation
Financial services· Published 17 Feb
CLOSED
25 May
£1.7bn
Estimated
Closed
CF
NL
NHS London Procurement Partnership (Hosted by Guy's and St Thomas' NHS FT)
Estates & Facilities Consultancy Dynamic Purchasing System
Architecture & engineering· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
PF
Procurement for Housing
Roofing and Associated Work - Dynamic Market
· Published 17 Feb
CLOSED
04 Mar
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Communication equipment
Radio & TV equipment· Published 17 Feb
CLOSED
02 Mar
£500k
Estimated
Closed
CF
FB
Ferrovial BAM Rail Systems
Professional Services - Ferrovial-BAM Joint Venture - HS2 Rail Systems
Business services· Published 17 Feb
CLOSED
16 Mar
—
Estimated
Closed
CF
LB
London Borough of Hounslow
Window Cleaning Sevices for the London Borough of Hounslow
Sewage & refuse· Published 17 Feb
CLOSED
31 Mar
—
Estimated
Closed
CF
WP
Werrington Parish Council
Renewal of surrounding soak away drainage and drain covers taking water into near by land drain
Construction work· Published 17 Feb
CLOSED
12 Mar
£2.3m
Estimated
Closed
CF
HT
Holy Trinity Hastings Church
Heritage at Holy Trinity Hastings - Main Contractor
Construction work· Published 16 Feb
CLOSED
11 Mar
—
Estimated
Closed
CF
EC
ENTERPRISE CHESHIRE AND WARRINGTON
Cheshire and Warrington Outline Energy Plan
R&D services· Published 16 Feb
CLOSED
27 Mar
—
Estimated
Closed
CF
CO
City of Doncaster Council
Asbestos removal and demolition of Edlington Leisure Centre
Construction work· Published 16 Feb
Page 46 of 8568
PreviousNext