PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
80
Open notices
Closing this week
486
Don’t miss
Open · all
2,945
Live opportunities
Posted · 24h
455
New notices
Posted · 30d
12,295
All notice types
Awarded · 7d
2,018
Market signal

Notice peek

×
CO
ClosedCF · b9480bced91c

Millennium Bridge Refurbishment

City of London Corporation
Status
Closed
Estimated
£3.5m
Published
05 Dec 2024

Key facts

Notice ID
cf-af75c1bb-0898-4f2b-a291-b9480bced91c
CPV code
44212120 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    05 Dec 2024

Description

The City Bridge Foundation is looking for a contractor to undertake the refurbishment of London's iconic Millennium Bridge. The project will include three key elements; 1. The resurfacing of the existing aluminium deck to improve slip resistance. The original aluminium deck is still in use. However, owing to high footfall over the bridge, the slip resistance of top surface of the deck has reduced and in some places the texture has completely worn away. The project will introduce a new surface coating to each deck plank to improve this slip resistance. 2. Repainting of the steelwork. The bridge was last touched up in 2016 and the paint system in in generally good condition. The project will repaint all areas of steel (including some not previously painted). 3. Re-tensioning of the suspension cables. This has not been completed before and will restore the profile of the central span following the initial relaxation of the cables and abutments. As a key river crossing it is important that disruption to the users of the bridge is minimised throughout the work. Contractors are encouraged to explore alternative solutions and approaches to maximise the time that the bridge can remain in operation during the project. Details of alternative solutions should be included separately as part of your submission. The Millennium Bridge is a 325m long steel suspension footbridge, with a main span of 144m, spanning over the River Thames linking the City of London at St. Paul's Cathedral with the Tate Modern Gallery at Bankside. First opened in June 2000, the bridge was closed almost immediately due to the excessive swaying movement of the structure caused by synchronised walking action from large groups of pedestrians. After investigations, the bridge was re-opened to the public in February 2002 with significant modifications added such as tuned mass dampers, to reduce both vertical and horizontal vibrations, and viscous dampers to resist the sway movements of the bridge. The bridge is supported on very shallow suspension cables on each side of the bridge made of 4 locked coil strands, each of 120mm diameter. The cable has a span to dip ratio of 63:1. The cables are anchored at each abutment and pass over two river piers. The cables support a deck formed from steel longitudinal beams which are supported on transverse arms which clamp on to the cable at each side at 8m intervals. The steel deck supports aluminium decking panels which span transversely 3.6m over the majority of the length of the bridge until the deck bifurcates at the southern abutment. There are movement joints in the deck at 16m centres. About City Bridge Foundation City Bridge Foundation is a world class bridge owner and London's biggest independent charity funder. Our charity, City Bridge Foundation, was set up around 900 years ago for the maintenance of the old London Bridge. Our primary aim remains to maintain our five bridges - Tower, London,

You might also see

  • All City of London Corporation notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 484 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
20 Jan
£100k
Estimated
Closed
CF
BH
Broadland Housing Association
GB-Norwich: 24-022 - Bin Cleaning Services
Sewage & refuse· Published 09 Dec
CLOSED
24 Jan
—
Estimated
Closed
CF
FC
Freebridge Community Housing Limited
Cleaning Services
Sewage & refuse· Published 09 Dec
CLOSED
08 Jan
£500k
Estimated
Closed
CF
NY
North Yorkshire County Council
Planned Preventative Maintenance (PPM) Service for Air Source Heat Pumps (Leisure Centres)
Architecture & engineering· Published 09 Dec
CLOSED
07 Jan
£50k
Estimated
Closed
CF
TC
The Careers & Enterprise Company
GB-London: Embedding Careers in National Professional Qualifications
Business services· Published 09 Dec
CLOSED
16 Dec
—
Estimated
Closed
CF
GT
GALLIFORD TRY INFRASTRUCTURE LIMITED
A47 Blofield - Mastic Joint Sealing
Construction materials· Published 09 Dec
CLOSED
23 Dec
—
Estimated
Closed
CF
TW
The West of England Combined Authority
Heat From Mines in the West of England
Business services· Published 09 Dec
CLOSED
27 Jan
£500k
Estimated
Closed
CF
UO
University of Leeds
GB-Leeds: Provision of Laundry Services for Residential and Commercial Services
Other services· Published 09 Dec
CLOSED
01 Jan
£50k
Estimated
Closed
CF
AN
Advance Northumberland Limited
Ascent Homes Willow Farm - Phase 3, 2B and 4 Mastic Sealant
Construction work· Published 09 Dec
CLOSED
31 Dec
—
Estimated
Closed
CF
SH
Shropshire Healthcare Procurement Service
RA347113 - Vacuum Assisted Biopsy Consumables
Medical equipment· Published 09 Dec
CLOSED
30 May
—
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
Aspire Housing: Dynamic Purchasing System for Electricity, Gas & Water Supply
Petroleum & fuel· Published 09 Dec
CLOSED
20 Jan
£250k
Estimated
Closed
CF
ST
Shropshire Towns and Rural Housing
Repairs and Refurbishment at St Owens Road, Much Wenlock
Repair & maintenance· Published 09 Dec
CLOSED
22 Jan
£1.8m
Estimated
Closed
CF
CC
Capital City College Group
Provision of Legal Services to Capital City College
Business services· Published 09 Dec
CLOSED
09 Dec
£180k
Estimated
Closed
CF
UO
UNIVERSITY OF EXETER
Web Optimisation Platform
IT services· Published 09 Dec
CLOSED
24 Jan
—
Estimated
Closed
CF
B
B3Living
Fire Alarm, Safety Equipment & Emergency Lighting Maintenance Services
Repair & maintenance· Published 09 Dec
CLOSED
07 Jan
—
Estimated
Closed
CF
CO
City of London Corporation
Soft Market Testing - Rough Sleeper Navigators
Health & social· Published 09 Dec
CLOSED
02 Aug
—
Estimated
Closed
CF
NL
NHS LONDON COMMERCIAL HUB
PRJ2065 SEL ICB - Bexley Urgent Treatment Centres Market Engagement Exercise
Health & social· Published 09 Dec
CLOSED
31 Jan
£27k
Estimated
Closed
CF
NP
NORMANDY PARISH COUNCIL
Land Maintenance for Normandy Parish Council
Agricultural products· Published 09 Dec
CLOSED
28 Feb
£909k
Estimated
Closed
CF
AT
AMESBURY TOWN COUNCIL
Kings Gate Play Area Projects (6 Lots)
Musical instruments· Published 09 Dec
CLOSED
09 Dec
—
Estimated
Closed
CF
EA
Environment Agency
Provision of weir wire ropes and fittings
Construction materials· Published 09 Dec
CLOSED
17 Jan
£2.0m
Estimated
Closed
CF
NF
New Forest District Council
e-ITT to establish a Framework Agreement for the provision of Bathroom Replacements to NFDC properties (April 2025-2029)
Construction work· Published 09 Dec
Page 484 of 8764
PreviousNext