PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
247
New notices
Posted · 30d
8,181
All notice types
Awarded · 7d
1,066
Market signal

Notice peek

×
BP
ClosedCF · d8cd927998d9

BPA Capital Programme BP1

Britten Pears Arts
Status
Closed
Estimated
—
Published
12 Mar 2025

Key facts

Notice ID
cf-10a1e261-b645-4b72-85b9-d8cd927998d9
CPV code
45453100 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    12 Mar 2025

Description

Britten Pears Building (BP1) Full internal refurbishment including new mechanical and electrical services, new toilets and refurbished windows, excluding the Trask Café and Kitchen finishes. Construction of a new lift tower to enable enhanced access to upper floors, facilitated by partial wall and roof removal. Removal of the existing and installation of a new repositioned sprinkler tank in the service yard between the Britten Pears Building and the Concert Hall. General access improvements, including a new entrance ramp and passenger and equipment lift to all floors and the replacement and automation of the entrance doors. Conversion of the first floor practice rooms to provide seven larger multifunction studios/break out spaces. Creation of an accessible top floor multi-purpose activity space, created through internal reconfiguration of the Cranbrook Room. Thermal upgrades to fabric to reduce energy consumption. Transformation of the Peter Pears Recital room into flexible studio and refurbishment of its bleacher seating. Removal of the old technical room to create accessible seating areas. New lighting system, sound and video infrastructure including permanent lighting and AV control position. New wheelchair positions to the upper level and improved wheelchair access to the lower level. Installation of a backstage Technical AV infrastructure throughout the building. External soft and hard landscaping alterations including steps and ramps and car park resurfacing to enable the provision of 3 blue badge parking bays. Works to be carried out in accordance with ecological requirements, including a Reasonable Avoidance Measures (RAMs) Method Statement and Construction Environmental Management Plan (CEMP). Carpark and Landscaping (FLD2) This scope is split into three parts, and will include surface upgrades with resin bound gravel and parking bay markings to allow the provision of Blue Badge spaces, with associated lighting improvements. Upgrades will be to the following areas: North car parks, including the Craft Shop and pond-side car parks to North West of the Concert Hall South car park, the Paddock car park to the South East of the Britten Pears Building BPA is seeking a Principal Contractor to complete the above works. The procurement of the works will follow a two stage flexible competitive tender process consisting of the following: - Stage 1: Selection Questionnaire (PQQ), issued on the Central Digital Platform - Stage 2: Tender, issued to successful contractors following Stage 1.

You might also see

  • All Britten Pears Arts notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 50 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
17 Feb
—
Estimated
Modification
FTS
OB
Oxford Brookes University
Website Content Management System Replacement Project, Student App and Staff Intranet Project
· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
UA
UK Atomic Energy Authority
33kV Substation SCADA Supply
· Published 17 Feb
CLOSED
04 Mar
—
Estimated
Closed
CF
DF
Department for Education
Best Start Free Breakfast Clubs Enrichment Sponsorship Academic Year 26/27
Musical instruments· Published 17 Feb
CLOSED
04 Mar
£1.0m
Estimated
Closed
CF
WY
West Yorkshire Combined Authority
Batch 757 - Bradford May 2026
Transport services· Published 17 Feb
CLOSED
18 Mar
—
Estimated
Closed
CF
CP
CRESCENT PURCHASING LIMITED
CA17224 - Electronic Payment Methods
Software packages· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
HF
Harris Federation
Harris Federation Lettings Requirement for Five Academy Schools (individual Lots)
· Published 17 Feb
CLOSED
20 Mar
—
Estimated
Closed
CF
RT
Rugeley Town Council
Rugeley Town Council - Supply of Christmas Lights and associated works for a 3-year contract
Electrical machinery· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
YS
York St John University
ITT for the Provision of HVAC (heating, ventilation and air conditioning) and PPM (Planned Preventative Maintenance) Services to York St John University
· Published 17 Feb
CLOSED
17 Feb
£870k
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Leeming External Refurbishments to 33 properties - FY2026/27 - Amey North Region - Northern England
Construction work· Published 17 Feb
CLOSED
30 Mar
—
Estimated
Closed
CF
SC
South Cambridgeshire District Council
South Cambridgeshire District Council - Reinstatement Evaluation
Financial services· Published 17 Feb
CLOSED
25 May
£1.7bn
Estimated
Closed
CF
NL
NHS London Procurement Partnership (Hosted by Guy's and St Thomas' NHS FT)
Estates & Facilities Consultancy Dynamic Purchasing System
Architecture & engineering· Published 17 Feb
CLOSED
17 Feb
—
Estimated
Modification
FTS
PF
Procurement for Housing
Roofing and Associated Work - Dynamic Market
· Published 17 Feb
CLOSED
04 Mar
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Communication equipment
Radio & TV equipment· Published 17 Feb
CLOSED
02 Mar
£500k
Estimated
Closed
CF
FB
Ferrovial BAM Rail Systems
Professional Services - Ferrovial-BAM Joint Venture - HS2 Rail Systems
Business services· Published 17 Feb
CLOSED
16 Mar
—
Estimated
Closed
CF
LB
London Borough of Hounslow
Window Cleaning Sevices for the London Borough of Hounslow
Sewage & refuse· Published 17 Feb
CLOSED
31 Mar
—
Estimated
Closed
CF
WP
Werrington Parish Council
Renewal of surrounding soak away drainage and drain covers taking water into near by land drain
Construction work· Published 17 Feb
CLOSED
12 Mar
£2.3m
Estimated
Closed
CF
HT
Holy Trinity Hastings
Heritage at Holy Trinity Hastings - Main Contractor
Construction work· Published 16 Feb
CLOSED
11 Mar
—
Estimated
Closed
CF
EC
ENTERPRISE CHESHIRE AND WARRINGTON
Cheshire and Warrington Outline Energy Plan
R&D services· Published 16 Feb
CLOSED
27 Mar
—
Estimated
Closed
CF
CO
City of Doncaster Council
Asbestos removal and demolition of Edlington Leisure Centre
Construction work· Published 16 Feb
CLOSED
02 Mar
—
Estimated
Closed
CF
SM
Sandwell Metropolitan Borough Council
Invitation to a Preliminary Market Engagement Event - Wrap Around Service
Health & social· Published 16 Feb
Page 50 of 8261
PreviousNext