PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
73
Open notices
Closing this week
463
Don’t miss
Open · all
2,958
Live opportunities
Posted · 24h
631
New notices
Posted · 30d
12,910
All notice types
Awarded · 7d
2,030
Market signal

Notice peek

×
CO
ClosedCF · b9480bced91c

Millennium Bridge Refurbishment

City of London Corporation
Status
Closed
Estimated
£3.5m
Published
05 Dec 2024

Key facts

Notice ID
cf-af75c1bb-0898-4f2b-a291-b9480bced91c
CPV code
44212120 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    05 Dec 2024

Description

The City Bridge Foundation is looking for a contractor to undertake the refurbishment of London's iconic Millennium Bridge. The project will include three key elements; 1. The resurfacing of the existing aluminium deck to improve slip resistance. The original aluminium deck is still in use. However, owing to high footfall over the bridge, the slip resistance of top surface of the deck has reduced and in some places the texture has completely worn away. The project will introduce a new surface coating to each deck plank to improve this slip resistance. 2. Repainting of the steelwork. The bridge was last touched up in 2016 and the paint system in in generally good condition. The project will repaint all areas of steel (including some not previously painted). 3. Re-tensioning of the suspension cables. This has not been completed before and will restore the profile of the central span following the initial relaxation of the cables and abutments. As a key river crossing it is important that disruption to the users of the bridge is minimised throughout the work. Contractors are encouraged to explore alternative solutions and approaches to maximise the time that the bridge can remain in operation during the project. Details of alternative solutions should be included separately as part of your submission. The Millennium Bridge is a 325m long steel suspension footbridge, with a main span of 144m, spanning over the River Thames linking the City of London at St. Paul's Cathedral with the Tate Modern Gallery at Bankside. First opened in June 2000, the bridge was closed almost immediately due to the excessive swaying movement of the structure caused by synchronised walking action from large groups of pedestrians. After investigations, the bridge was re-opened to the public in February 2002 with significant modifications added such as tuned mass dampers, to reduce both vertical and horizontal vibrations, and viscous dampers to resist the sway movements of the bridge. The bridge is supported on very shallow suspension cables on each side of the bridge made of 4 locked coil strands, each of 120mm diameter. The cable has a span to dip ratio of 63:1. The cables are anchored at each abutment and pass over two river piers. The cables support a deck formed from steel longitudinal beams which are supported on transverse arms which clamp on to the cable at each side at 8m intervals. The steel deck supports aluminium decking panels which span transversely 3.6m over the majority of the length of the bridge until the deck bifurcates at the southern abutment. There are movement joints in the deck at 16m centres. About City Bridge Foundation City Bridge Foundation is a world class bridge owner and London's biggest independent charity funder. Our charity, City Bridge Foundation, was set up around 900 years ago for the maintenance of the old London Bridge. Our primary aim remains to maintain our five bridges - Tower, London,

You might also see

  • All City of London Corporation notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 502 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
20 Dec
£70k
Estimated
Closed
CF
TW
The West of England Combined Authority
Mayoral Priority Skills Fund (MPSF) Phase One Evaluation
Business services· Published 02 Dec
CLOSED
20 Jan
—
Estimated
Closed
CF
RM
Rochdale Metropolitan Borough Council
Supporting People to Live Well at Home
Health & social· Published 02 Dec
CLOSED
12 Dec
—
Estimated
Closed
CF
LB
LONDON BOROUGH OF HAVERING
Occupational Therapy Assessments
Health & social· Published 02 Dec
CLOSED
10 Jan
£227.2m
Estimated
Closed
CF
KC
Kent County Council
SC250080 - Household Waste Recycling Centres and Waste Transfer Stations
Sewage & refuse· Published 02 Dec
CLOSED
13 Dec
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree works operations
Repair & maintenance· Published 02 Dec
CLOSED
09 Jan
—
Estimated
Closed
CF
NE
NORTH EAST ACCESS TO FINANCE LIMITED
Tender for Group Auditor 2025
Business services· Published 02 Dec
CLOSED
06 Jan
£840k
Estimated
Closed
CF
PC
Peterborough City Council
School-Aged Health Improvement and Prevention Service (SHIPS)
Health & social· Published 02 Dec
CLOSED
17 Jan
—
Estimated
Closed
CF
BB
Basildon Borough Council
Leasehold Property Insurance (excluding broker services)
Financial services· Published 02 Dec
CLOSED
17 Jan
—
Estimated
Closed
CF
WC
Worcester City Council
Fire alarm, Firefighting Equipment and Emergency Lighting servicing
Repair & maintenance· Published 02 Dec
CLOSED
17 Dec
—
Estimated
Closed
CF
N
NE
Allonby Bay HPMA eDNA Analysis for Community Assessment
Sewage & refuse· Published 02 Dec
CLOSED
13 Dec
—
Estimated
Closed
CF
LB
London Borough Of Islington
Arboricultural services - Tree works operations
Repair & maintenance· Published 02 Dec
CLOSED
03 Jan
£75k
Estimated
Closed
CF
SM
Science Museum Group
NCC Consolidation Programme: Pest Remediation​
Sewage & refuse· Published 02 Dec
CLOSED
10 Jan
—
Estimated
Closed
CF
BC
Brockenhurst College
Brockenhurst College ~ Cleaning Tender
Sewage & refuse· Published 02 Dec
CLOSED
07 Jan
£50k
Estimated
Closed
CF
VA
Victoria and Albert Museum
GB-London: Climate Action Plan
Business services· Published 02 Dec
CLOSED
13 Jan
—
Estimated
Closed
CF
CT
Corsham Town Council
Designing and Constructing a New Skatepark at Springfield, Corsham
Recreational & cultural· Published 02 Dec
CLOSED
13 Jan
£6.0m
Estimated
Closed
CF
RA
Redcar and Cleveland Borough Council
Community Opportunities Framework
Health & social· Published 02 Dec
CLOSED
06 Dec
—
Estimated
Closed
CF
SC
Stoke-on-Trent Council
Supply and installation of 4 feet deep concrete burial chambers
Construction work· Published 02 Dec
CLOSED
10 Feb
—
Estimated
Closed
CF
LM
LIFECYCLE MANAGEMENT GROUP LIMITED
LGM38033
Furniture & furnishings· Published 02 Dec
CLOSED
23 Dec
—
Estimated
Closed
CF
SC
Shropshire Council
Invitation to Quote for an Interpretation and Translation Service for Deaf, Deaf Blind and Hard of Hearing People in Shropshire
Business services· Published 02 Dec
CLOSED
06 Dec
—
Estimated
Closed
CF
SC
Stoke-on-Trent Council
Supply and installation of 4 feet deep concrete burial chambers
Construction work· Published 02 Dec
Page 502 of 8764
PreviousNext