PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,296
Live opportunities
Posted · 24h
151
New notices
Posted · 30d
5,633
All notice types
Awarded · 7d
728
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,488 noticesclosed · sorted by publication date
Page 62 of 8575
Time to close
Value
Type
Buyer
Notice
CLOSED
23 Jan
—
Estimated
Modification
FTS
CS
Cyngor Sir Ceredigion County Council
Ceredigion - Public Minibus Saturday Service
· Published 23 Jan
CLOSED
23 Jan
£9.0m
Estimated
Closed
CF
MO
Ministry of Defence
Supply Chain Notice: BLD0311-01 Lift Remedial Work Programme-Major Works
Construction work· Published 23 Jan
CLOSED
23 Jan
—
Estimated
Modification
FTS
LS
LEIDOS SUPPLY, LIMITED
Supply of Laboratory & Fuels Assurance Equipment Equipment
· Published 23 Jan
CLOSED
05 Feb
—
Estimated
Closed
CF
AL
ADB (UK) LIMITED
CA16976 - HR, PAYROLL, EMPLOYEE SCREENING SERVICES AND SOFTWARE
Business services· Published 23 Jan
CLOSED
27 Feb
—
Estimated
Closed
CF
TD
The David Ross Education Trust
CA17064 - The David Ross Education Trust Tender for Catering Services
Hotel & restaurant· Published 23 Jan
CLOSED
06 Feb
£5k
Estimated
Closed
CF
DT
Dereham Town Council
HR and recruitment advice
Business services· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Modification
FTS
GB
Gateshead Borough Council
Framework for The Supply of Provision of a Fully Integrated TH3 Powered Air Respirator
· Published 22 Jan
CLOSED
20 Feb
—
Estimated
Closed
CF
CS
Central Swindon North Parish Council
Car Parking Management
Other services· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Closed
CF
LC
Liverpool City Council
ADULT LEARNING SERVICE - FLEXIBLE PURCHASING SYSTEM
Education & training· Published 22 Jan
CLOSED
24 Feb
—
Estimated
Closed
CF
LB
London Borough of Merton
Merton Adult Learning Main Delivery Service
Education & training· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Modification
FTS
KC
Kent County Council
CN250355 - Managed Accounts & Payroll Service
· Published 22 Jan
CLOSED
30 Jan
£5.0m
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
GB-Rayleigh: PERIODIC INDICATIVE NOTICE (PIN)-Provision of Hard Facilities Management Services
Business services· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Modification
FTS
CC
Caerphilly County Borough Council
Asset Management Solution for Property & Finance Services
· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Closed
FTS · Works
T
Trivallis
Kitchens & Bathrooms Programme
Construction work· Published 22 Jan
CLOSED
20 Feb
—
Estimated
Closed
CF
YC
York College
CA17046 - York College - ITT for the Supply of Staff and Student Uniform and PPE
Clothing & footwear· Published 22 Jan
CLOSED
26 Feb
£142k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Outdoor Audio Systems
Radio & TV equipment· Published 22 Jan
CLOSED
13 Feb
£500k
Estimated
Closed
CF
UP
UNITE PROCUREMENT UK LIMITED
Supply of Armoured Containers
Security & defence· Published 22 Jan
CLOSED
22 Jan
—
Estimated
Closed
CF
MO
Ministry of Defence
Supply Chain Notice: BLD0311-01 Lift Remedial Work Programme-Major Work
Construction work· Published 22 Jan
CLOSED
08 Jan
—
Estimated
Closed
CF
MO
Ministry of Defence
Global Network Design - Contract Award Notice
Software packages· Published 22 Jan
CLOSED
06 Feb
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Demolition of Existing Motorway Bridges
Construction work· Published 22 Jan
Page 62 of 8575
PreviousNext