PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
65
Open notices
Closing this week
459
Don’t miss
Open · all
2,980
Live opportunities
Posted · 24h
629
New notices
Posted · 30d
12,984
All notice types
Awarded · 7d
2,072
Market signal

Notice peek

×
MO
ClosedCF · e0f780122190

WC1167436 - Construction of 3No. New masts to replace existing masts on TCI antenna in SLS, Akrotiri

Ministry of Defence, DIO,
Status
Closed
Estimated
—
Published
10 Jan 2025

Key facts

Notice ID
cf-970fbe1c-696c-44ce-9fc4-e0f780122190
CPV code
44212250 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Jan 2025

Description

The scope of works involves replacing the existing TCI masts with new ones, including the replacement of guy wire anchors and associated rigging accessories, as well as the installation of bird flight deflectors. The foundations for both the masts and the guy wires have already been completed as part of a separate project. The successful contractor will be required to install the towers and guy wires in accordance with the provided drawings and specifications. The TCI antenna system comprises of three guyed steel masts (MT0079, MT0080, and MT0081) located at the Salt Lake Site (West Site) in the RAF Akrotiri area, Cyprus. These masts were originally constructed circa 1997. The Salt Lake Site is a wetland in close proximity to the seafront of Akrotiri Bay, covering an area of approximately 10.65 km². It is divided into the West, Lizard, and Sandra Sites. The TCI antenna system, including the three masts in question, is located at the West Site of the Salt Lake. Table 1: List of masts included in the project S/N Location Asset No. Asset Description Asset Height (m) 1 Akrotiri MT0079 TCI - Steel lattice mast 45.7 2 Akrotiri MT0080 TCI - Steel lattice mast 45.7 3 Akrotiri MT0081 TCI - Steel lattice mast 11.0 The two taller masts are guyed steel lattice structures, each standing 45 meters high. The width and height of the lattice sections are 61cm. Each tower's three legs are composed of circular hollow sections (CHS) with a diameter of 57.2mm and a wall thickness of 2.66mm. The horizontal and diagonal bracings are also made of CHS members, measuring 25.4 mm in diameter with a wall thickness of 1.52mm. The bracing tubes have flattened ends with bolt holes for connection to the vertical CHS legs. The third mast is a guyed steel lattice structure standing 11 meters high. The width and height of the lattice sections are 49 cm. The tower's three legs are composed of CHS with a diameter of 38.1mm and a wall thickness of 1.90mm. The horizontal and diagonal bracings are also made of CHS members, measuring 19.05mm in diameter with a wall thickness of 1.52mm. The bracing tubes also have flattened ends with bolt holes for connection to the vertical CHS legs. The existing masts need to be demolished and reconstructed in accordance with the new design drawings and specifications. Please note that the project must be completed within a fixed period of approximately 4 weeks. This timeframe is non-negotiable, and no work will be allowed outside of the specified period. The contractor must allocate adequate resources to ensure the project is completed within this timeframe. The Provisional Key Tender dates for the project are as follows: · Issue of Tender Documents: Monday 27th January 2025. · Tender return date: Friday 28th February 2025. · Contract award date: Friday 04th April 2025. · Commencement of work onsite: Monday 01st September 2025. · Completion of Work: Friday 26th September 2025. The currency of this project is Euro (€)

You might also see

  • All Ministry of Defence, DIO, notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 81 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
16 Jan
—
Estimated
Closed
CF
TN
THE NATIONAL TRUST FOR PLACES OF HISTORIC INTEREST OR NATURAL BEAUTY
National Trust - NI - Woodland Restoration at The Argory
Agriculture & forestry· Published 23 Dec
CLOSED
23 Dec
—
Estimated
Modification
FTS
CK
Cross Keys Homes
Provision of Night Support Services to CKH Hostels
· Published 23 Dec
CLOSED
23 Dec
—
Estimated
Closed
FTS · Supplies
TC
The Common Services Agency (more commonly known as NHS National Services Scotland) (NSS)
NP38625 Compounded Aseptic Medicines
Medical equipment· Published 23 Dec
CLOSED
07 Jan
£100k
Estimated
Closed
CF
AJ
Anthro JV
Request for Proposal: Point Cloud Scanners for Construction Use
Business services· Published 23 Dec
CLOSED
27 Feb
£209.4m
Estimated
Closed
CF
H
HS2
HS2 Limited Green Assets Maintenance & Management Services
Agriculture & forestry· Published 23 Dec
CLOSED
29 Jan
—
Estimated
Closed
CF
SC
Somerset Council
Corporate Cleaning Contract 2026
Sewage & refuse· Published 22 Dec
CLOSED
24 Apr
£5.0m
Estimated
Closed
CF
NC
Nottingham City Council
CPU 7609 Pouring Rights Partnership and Drinks Supply for National Ice Centre & Motorpoint Arena
Food & beverages· Published 22 Dec
CLOSED
23 Dec
£150k
Estimated
Closed
CF
OC
Oxfordshire County Council
Delivery Director - RFQ
Business services· Published 22 Dec
CLOSED
23 Jan
£109k
Estimated
Closed
CF
LB
London Borough of Haringey
25-362: Batches 38A & 45
Construction work· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
UA
UK Atomic Energy Authority
Safety Case Peer Review Services
· Published 22 Dec
CLOSED
23 Jan
£1
Estimated
Closed
CF
UB
UK Battery Industrialisation Centre
W-O-T Project
Education & training· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
KP
Kent Police and Crime Commissioner
Kent & Medway Appropriate Adult (AA) Service
· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
UO
UNIVERSITY OF SHEFFIELD
4433/AMRC/GM/25 Digital Product Passport (DPP) - R2
· Published 22 Dec
CLOSED
05 Feb
—
Estimated
Closed
CF
RI
REED IN PARTNERSHIP LIMITED
Reed Wellbeing: Healthier You Services Expression of Interest
Health & social· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Closed
FTS · Works
BP
Bathampton Parish Council
Construction and Installation of Playground in Bathampton
Musical instruments· Published 22 Dec
CLOSED
22 Dec
£1
Estimated
Closed
CF
UB
UK Battery Industrialisation Centre
test only
Other services· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
BB
Bedford Borough Council
Supported Lodgings Framework
· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
TP
THE PIRBRIGHT INSTITUTE
Site HV/LV Supplies Maintenance
· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
TP
THE PIRBRIGHT INSTITUTE
Autoclave Service and Validation Contract
· Published 22 Dec
CLOSED
22 Dec
—
Estimated
Modification
FTS
NH
Notting Hill Genesis
Furniture Framework
· Published 22 Dec
Page 81 of 8764
PreviousNext