Supplier · Peer benchmark
Peer comparison
How Marine & Power Engineering Ltd stacks up against suppliers competing for the same workloads — based on overlap with its 2 signature CPV codes over the last 24 months. Target HQ: East Midlands.
Value band:
/
CohortMarine & Power Engineering Ltd(You)Serco LimitedDFP Services LtdP & I GENERATORS LIMITEDDale Power Solutions PLCOrskov Yard A/S
iAuto-picked from 2 signature CPV codes · last 24 months overlap
Metric | SE Serco Limited Peer · rank #1 | DS DFP Services Ltd Peer · rank #2 | P& P & I GENERATORS LIMITED Peer · rank #3 | DP Dale Power Solutions PLC Peer · rank #4 | M& Marine & Power Engineering Ltd (You) · target supplier | OY Orskov Yard A/S Peer · rank #6 |
|---|---|---|---|---|---|---|
01ActivityVolume, scale, freshness | ||||||
| 12-month contractedAward value, last 12m | £549.6m | £4.1m | £1.0m | £44k | — | — |
| Framework headroomPer-supplier share of framework ceilings | £23.8m | £20k | — | — | — | — |
| Total awarded (lifetime)All time, all contracts | £10.4bn | £109.0m | £1.7m | £10.4m | £433k(−99%) | £38.0m |
| Contracts won (12m)Distinct awards last year | 14 | 9 | 3 | 1 | — | — |
How to read a target cell
The target column carries a delta — value compared to the peer median for that row. Direction-of-good varies by metric, so deltas are neutral.
Peer cell£499m(peer median £255m)
→
Target cell£11.7m(−97% vs median)
Money:
£N.Nm, £Nk, £N.NbnPercent: 42% · pp delta: (+12pp)Day delta: (−149 days) · missing: —