Commercial Gas PPM, servicing and repair across various LiveWest locations
Estimated value
—
Awarded value
£1.8m
Suppliers
1
Lots
2
Published
21 Aug 2025
Description
Annual gas safety check to be completed in line with GSIUR 1998 - to be completed between months 10 and 11 of the due date, with none running into the final month of compliance. Documentation to be provided within 48 hours of completion. PPM - To be completed on a quarterly basis in line with appliance manufacturers specification and instruction. Certification/documentation to be provided detailing drop test, inspection of all equipment, supply pipework, electrical supplies, valves and components within the plant room, photographic evidence will be required. Detail of system water testing to be provided. Repairs to be completed within an expedited manner and strong sense of urgency, understanding all residents require a high level of customer service during breakdown events. Contingency for the provision of temporary heating and hot water should be considered. Quotation to be provided prior to repairs, authorisation being essential prior to affectation of the repair. Documentation post works completion to be provided prior to invoicing of works. Emergency response to be attended within 24 hours; and same day response to high dependency schemes indicated in yellow on the schedule's spreadsheet. Planned Works- Remediations on DESEAR risk assessments, system replacements, upgrades to be quoted with 5 working days; and authorisation to be sought prior to commencement. Detailed completion report with pre & post evidence images, readings and legal documentation. Contractor to be gas safe registered, qualified and competent on the gas appliances and systems being tendered for. Public and employers' liability to be provided to a minimum of £10million. Gas engineers employed on the contract to be notified to client for adding to their database. Upgrades - Upgrades will be required on an ad-hoc basis However we will reserve the right to request pricing from alternative suppliers
Scope
- Reference
- DN778679
- Commercial tool
- Standalone contract
- Contract dates
- 31 Aug 2025 to 01 Sept 2028Possible extension to 01 Sept 2031
3.2 The Contract will be for an initial term of 3 years extendable at the Client's sole option for a period of 36 months, giving a total of 6 years.
- CPV classifications
- 50531100
- Contract locations
- South West England, United KingdomSouth East England, United Kingdom
- Particular suitability
- Small and medium-sized enterprises (SME)Voluntary, community and social enterprises (VCSE)
Award criteria
Criteria the buyer will use to evaluate bids.
| Name | Description | Type | Weighting |
|---|---|---|---|
| Price | — | price | 40.00% |
| Quality | — | quality | 60.00% |
Submission & procedure
- Procedure
- Open procedure
Award details
Awarded supplier(s), contract period and value as published in the award notice.
Awarded value
£1.8m
Award date
20 Aug 2025
Contract start
30 Sept 2025
Contract end
01 Oct 2028
Lots · 2 total
Divisions of the contract. Each lot can be awarded separately.
| Lot | Title | Est. value | Status |
|---|---|---|---|
| 1 | Lot 1 | £400k | complete |
| 2 | Lot 2 | £400k | complete |
Awarded suppliers· 1 supplier
Awarded 20 Aug 2025 · Contract period 30 Sept 2025 — 01 Oct 2028
Total lots
2
Awarded
2
Estimated total
£800k
Awarded total
£1.8m
Lot 1
Start
31 Aug 2025
End
01 Sept 2028
Estimated
£400k
CPV
Lot 2
Start
31 Aug 2025
End
01 Sept 2028
Estimated
£400k
CPV
Other contracts from LIVEWEST HOMES LIMITED
Full notice and award history for this contracting authority is on the buyer profile.
Other contracts awarded to WEMCO LIMITED· 10
Cross-buyer view of this supplier's public-sector wins.
| Title | Type | Value | Published |
|---|---|---|---|
| M&E Strip out | contract | — | 08 May 2026 |
| PLA25228 Mayfield Chestnut Site Heat Pump Installation | contract | — | 10 Apr 2026 |
| Commercial Gas PPM, servicing and repair across various LiveWest locations | contract | — | 13 Jan 2026 |
| PLA25206 Chestnut School Boiler Replacement | contract | — | 24 Dec 2025 |
| CP2549-24: Devon and Somerset Standing List of Approved Contractors (SLoAC) 2025 | contract | — | 02 May 2025 |
| TPL5224 Maintenance Contractors Framework | contract | — | 01 May 2025 |
| CP2549-24: Devon and Somerset Standing List of Approved Contractors (SLoAC) 2025 | call off | £323k | 30 Apr 2025 |
| Building Service Term Contracts 2020 | contract | £750k | 08 Nov 2024 |
| CP2455-23 Devon Maintenance Panel Agreement 2024-2028 | call off | £465k | 02 Jul 2024 |
| CP2455-23 Devon Maintenance Panel Agreement 2024-2028 | contract | — | 02 Jul 2024 |