Urgent replacement of Civic boiler
Estimated value
—
Awarded value
—
Suppliers
1
Lots
1
Published
30 May 2025
Description
The civic boiler room plant is now end of life and requires replacement as this will be a health & safety issue. The current heating system has limited control and was only a stop gap until completion of the original project. The boilers are in danger of major fail. 5 of the 9 modules have now fully failed. If we lose another module the water temperature will drop into a dangerous legionella risk zone and the system will have to be shut down leaving the civic, civic suite & courthouse with no heating. The system will also require a full chlorination.