PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
310
New notices
Posted · 30d
12,035
All notice types
Awarded · 7d
1,507
Market signal

Notice peek

×
KM
ClosedCF · 45eda0d78114

Central Substation RIBA4 & Build

KBS Maritime Ltd
Status
Closed
Estimated
—
Published
25 Feb 2026

Key facts

Notice ID
cf-3001bab6-7d96-4385-bc96-45eda0d78114
CPV code
45000000 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    25 Feb 2026

Description

The overarching requirement of the project is to develop the RIBA Stage 3 Design into a complete RIBA Stage 4 Technical Design and subsequently build and commission the new Central Substation building (through RIBA Stage 5 and 6). This project is split into two principal Phases as outlined below - a Design Phase (1) and a Build Phase (2), each with their own corresponding Work Packages. In summary, this Project includes the following work packages: Project Phase 1 (Design) includes the following work packages: • WP 1: Survey and assessment work to facilitate the RIBA 4 design. • WP 2: RIBA 4 Technical Design incl. all temporary works designs. • WP 3: Undertake earthing design for Central Substation. Project Phase 2 (Build) includes the following work package: • WP 4: RIBA 5 and 6: Construct, Commission and Handover the works as designed in Phase 1. Installation of HV/LV Electrical switch panels and associated cabling shall not form part of this work, and will follow as a separate project once WP 4 is complete.

You might also see

  • All KBS Maritime Ltd notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 113 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
11 Nov
£10k
Estimated
Closed
CF
NE
North East Lincolnshire Borough Council
Heritage Place Development & Growth Programme NEL
Business services· Published 17 Oct
CLOSED
23 Oct
£150k
Estimated
Closed
CF
WS
West Sussex County Council
Ryebank - Klargester Replacement
Construction work· Published 17 Oct
CLOSED
18 Dec
£2.5m
Estimated
Closed
CF
FS
Fujitsu Services UK Ltd
SME Opportunity - Fibre & Copper Installation at Heathrow (Fujitsu)
Architecture & engineering· Published 17 Oct
CLOSED
31 Oct
£250.0m
Estimated
Closed
CF
SC
Sizewell C Limited
SZC - Main Works Earthworks - Bulk Excavation
Construction work· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Communal Heating Installation Works
· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Delivery Warm Homes
· Published 17 Oct
CLOSED
05 Dec
—
Estimated
Closed
CF
TP
The Portico Academy Trust
CA16616 - Portico Academy Trust _ Essex
Sewage & refuse· Published 17 Oct
CLOSED
17 Nov
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1842-T-TS Fire Safety Services
Electrical machinery· Published 17 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
UO
University of Bristol
Archive Collections Management System
Software packages· Published 16 Oct
CLOSED
27 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Noise Barrier Piles
Transport equipment· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
NR
Network Rail Infrastructure Ltd
W&W Earthworks Examinations CP7 Year 2
· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
CO
City of York Council
Planned Maintenance of Fire Systems and Emergency Lighting
· Published 16 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
DF
Department for Education
Tackling Antisemitism in Education Innovation Fund - Market Engagement Event
Education & training· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
FTS · Services
ST
ScotRail Trains Ltd
SR-PACT-PROJ-216 HST Power Car Remote Monitoring System
Repair & maintenance· Published 16 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA354085 - Concrete Platform Slab Repair
Construction work· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: BLD0277-02 24 Store Roof Remedials
Construction work· Published 16 Oct
CLOSED
20 Nov
£5.0m
Estimated
Closed
CF
TU
THE UNIVERSITY OF WESTMINSTER
Estates - General Consultancy Support
Architecture & engineering· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
US
UK SPACE AGENCY
UKSAC25_0071 - Threat Led Penetration Testing - Black Team
· Published 16 Oct
CLOSED
22 Oct
£250k
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6101 - Water Treatment for LTHW and CHW Closed Loop Systems - Intrusive surveys (Terminal 2)
Construction work· Published 16 Oct
CLOSED
22 Oct
£1.0m
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6102 - Water Treatment for Cooling Towers - intrusive survey & design (All Terminals)
Construction work· Published 16 Oct
Page 113 of 8261
PreviousNext