PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
105
New notices
Posted · 30d
7,603
All notice types
Awarded · 7d
935
Market signal

Notice peek

×
BG
ClosedCF · e85ce70f06b0

Pre-construction Manager

BGIS Global Integrated Solutions Ltd
Status
Closed
Estimated
—
Published
17 Apr 2025

Key facts

Notice ID
cf-2590b381-49e2-47bb-9e36-e85ce70f06b0
CPV code
34632100 · Transport equipment
Source
Contracts Finder

Timeline

  1. Published
    17 Apr 2025

Description

Project Keystone comprises the design, supply, installation, testing, commissioning, and handover of a comprehensive upgrade to the existing Building Management System (BMS) at CH, covering both the TS and CS. The site consists of two interconnected buildings in central London. Primary plant, including chillers, cooling towers, fresh air ventilation, boilers, and pumps, is located across basement and roof levels. Local systems are supported by supplementary plant on the office floors, where comfort conditions are maintained via a 4-pipe fan coil unit (FCU) system. The existing Trend BMS infrastructure is a combination of legacy and partially upgraded components, including IQ3, IQL, IQ4, and IQEco controllers. A partial system upgrade was completed in 2018, which included: - Replacement of selected IQ3 main plant controllers with IQ4 equivalents - Upgrade from Trend 963 to Trend IQVision graphical user interface - Integration of two separate site BMS networks into a unified IP network - Replacement of some IQL terminal unit controllers with IQEco units However, the 2018 upgrade did not address all legacy hardware. A significant portion of IQ3 controllers and associated I/O modules remain in operation. This project seeks to complete the BMS modernisation by: - Replacing all remaining IQ3 and IQL controllers with IQ4 and IQEco units, respectively - Removing obsolete I/O modules and integrating new hardware with existing field wiring - Rationalising the network architecture to ensure optimal performance and future maintainability - Enhancing the operator interface, trend logging, and graphical capabilities via IQVision - Integrating additional monitoring elements, including return air sensors, sump status, and alarm functionality The building shall remain live and operational throughout the duration of the works. The Contractor shall ensure minimal disruption to occupants and business operations, with particular care taken in occupied and secure zones. The works must be carried out in phases, with any required isolation or shutdowns carefully coordinated with the CH Facilities Management team and subject to prior approval. Contractors shall allow for the complexity of interfacing with retained services and ensure a thorough validation of the existing BMS network infrastructure prior to implementation. Any discrepancies between existing records and site conditions shall be identified and resolved as part of the scope.

You might also see

  • All BGIS Global Integrated Solutions Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 116 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
31 Oct
£250.0m
Estimated
Closed
CF
SC
Sizewell C Limited
SZC - Main Works Earthworks - Bulk Excavation
Construction work· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Communal Heating Installation Works
· Published 17 Oct
CLOSED
17 Oct
—
Estimated
Modification
FTS
AD
Ashfield District Council
Delivery Warm Homes
· Published 17 Oct
CLOSED
05 Dec
—
Estimated
Closed
CF
TP
The Portico Academy Trust
CA16616 - Portico Academy Trust _ Essex
Sewage & refuse· Published 17 Oct
CLOSED
17 Nov
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1842-T-TS Fire Safety Services
Electrical machinery· Published 17 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
UO
University of Bristol
Archive Collections Management System
Software packages· Published 16 Oct
CLOSED
27 Oct
£10.0m
Estimated
Closed
CF
BB
Balfour Beatty VINCI JV HS2
BBV HS2 MWCC North - Noise Barrier Piles
Transport equipment· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
NR
Network Rail Infrastructure Ltd
W&W Earthworks Examinations CP7 Year 2
· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
CO
City of York Council
Planned Maintenance of Fire Systems and Emergency Lighting
· Published 16 Oct
CLOSED
30 Oct
—
Estimated
Closed
CF
DF
Department for Education
Tackling Antisemitism in Education Innovation Fund - Market Engagement Event
Education & training· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
FTS · Services
ST
ScotRail Trains Ltd
SR-PACT-PROJ-216 HST Power Car Remote Monitoring System
Repair & maintenance· Published 16 Oct
CLOSED
31 Oct
—
Estimated
Closed
CF
LL
LondonEnergy Ltd
RA354085 - Concrete Platform Slab Repair
Construction work· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Supply Chain Notice: BLD0277-02 24 Store Roof Remedials
Construction work· Published 16 Oct
CLOSED
20 Nov
£5.0m
Estimated
Closed
CF
TU
THE UNIVERSITY OF WESTMINSTER
Estates - General Consultancy Support
Architecture & engineering· Published 16 Oct
CLOSED
16 Oct
—
Estimated
Modification
FTS
US
UK SPACE AGENCY
UKSAC25_0071 - Threat Led Penetration Testing - Black Team
· Published 16 Oct
CLOSED
22 Oct
£250k
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6101 - Water Treatment for LTHW and CHW Closed Loop Systems - Intrusive surveys (Terminal 2)
Construction work· Published 16 Oct
CLOSED
22 Oct
£1.0m
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6102 - Water Treatment for Cooling Towers - intrusive survey & design (All Terminals)
Construction work· Published 16 Oct
CLOSED
22 Oct
£250k
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP2910 - At Height Safety Survey & Design
Architecture & engineering· Published 16 Oct
CLOSED
22 Oct
£250k
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6101 - Water Treatment for LTHW and CHW Closed Loop Systems - Intrusive surveys (Terminal 2)
Construction work· Published 16 Oct
CLOSED
22 Oct
£1.0m
Estimated
Closed
CF
CL
Costain Limited (H7-Heathrow)
WP6102 - Water Treatment for Cooling Towers - intrusive survey & design (All Terminals)
Construction work· Published 16 Oct
Page 116 of 8261
PreviousNext