PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
208
New notices
Posted · 30d
7,018
All notice types
Awarded · 7d
912
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 238 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
07 Apr
—
Estimated
Closed
FTS · Supplies
UO
University of Leeds
202425 4810- Supply of a high precision gas analyser for CO2, CH4, H2O
· Published 07 Apr
CLOSED
09 May
—
Estimated
Closed
CF
LF
Leicester Forest East Parish Council
Christmas Lights 2025-2027
Electrical machinery· Published 07 Apr
CLOSED
21 Mar
—
Estimated
Closed
CF
UO
University of Leeds
202425 4810- Supply of a high precision gas analyser for CO2, CH4, H2O
Laboratory equipment· Published 07 Apr
CLOSED
05 Aug
£54
Estimated
Closed
CF
LC
Leicester City Council
35074 - BARLEY CROFT PRIMARY SCHOOL
Transport services· Published 07 Apr
CLOSED
30 Apr
£75k
Estimated
Closed
CF
SC
Southend City Council
M2425-12 - Cluny House Lift Modernisation
Industrial machinery· Published 07 Apr
CLOSED
24 Apr
—
Estimated
Closed
CF
SC
Surrey County Council
Request for Information (RFI) For: Digital Post-mortem Service
Construction work· Published 07 Apr
CLOSED
25 Apr
£300k
Estimated
Closed
CF
UC
University College London Hospitals NHS Foundation Trust
UCLH-6682 - Legal Services For Employment Case
Business services· Published 07 Apr
CLOSED
14 Apr
—
Estimated
Closed
CF
GT
GALLIFORD TRY INFRASTRUCTURE LIMITED
A47 Blofield to North Burlingham Dualling - LANDSCAPING
Construction materials· Published 07 Apr
CLOSED
23 Apr
£185k
Estimated
Closed
CF
LL
London Luton Airport Operations Limited
L25017-T-MC - Workforce Management System
Software packages· Published 07 Apr
CLOSED
18 Apr
£100k
Estimated
Closed
CF
AG
ARK GROUP DMCC
B6 - Civilian Armoured Vehicle - SUV
Transport equipment· Published 04 Apr
CLOSED
13 May
—
Estimated
Closed
CF
WW
WESTON WITH GAYTON
Weston Village Hall Changing Rooms Refurbishment
Construction work· Published 04 Apr
CLOSED
08 May
—
Estimated
Closed
CF
BC
Bury Council
Invitation to Tender for Phase 4 Reroofing (Ref 3+4 Areas) at Derby High School, Radcliffe Road, Bury. BL9 9NH
Construction work· Published 04 Apr
CLOSED
16 May
£60k
Estimated
Closed
CF
WP
Windlesham Parish Council
Windlesham Parish Council Festive Lights & Trees
Electrical machinery· Published 04 Apr
CLOSED
23 May
—
Estimated
Closed
CF
LC
Leicester College
CA15640 - Lift Servicing and Maintenance
Repair & maintenance· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Supplies
LC
Lincolnshire County Council
Multi-Agency Case Management System
· Published 04 Apr
CLOSED
30 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Hearing Protection Communication and Situational Awareness (HPCSA) Programme Early Market Engagement (EME)
Clothing & footwear· Published 04 Apr
CLOSED
11 Apr
—
Estimated
Closed
CF
SH
Shropshire Healthcare Procurement Service
RA350167 - Dental Consumables
Medical equipment· Published 04 Apr
CLOSED
03 May
—
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
Catering services Wethersfield, Essex
Hotel & restaurant· Published 04 Apr
CLOSED
02 May
—
Estimated
Closed
CF
CG
Clearsprings Group (Ready Homes)
Cleaning services Wethersfield, Braintree, Essex
Sewage & refuse· Published 04 Apr
CLOSED
04 Apr
—
Estimated
Closed
FTS · Services
SB
Swindon Borough Council
Water Hygiene Quality Monitoring Services
Laboratory equipment· Published 04 Apr
Page 238 of 8261
PreviousNext