PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
75,311
Live opportunities
Posted · 24h
147
New notices
Posted · 30d
5,499
All notice types
Awarded · 7d
710
Market signal

Notice peek

×
KT
ClosedCF · c50361b9fec8

Manchester International Airport - Temporary Works Piling Enabling Works

Kier Transportation - CP7 NWC
Status
Closed
Estimated
£500k
Published
10 Feb 2026

Key facts

Notice ID
cf-22a58595-1e7e-45f7-8219-c50361b9fec8
CPV code
44212400 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    10 Feb 2026

Description

"The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: The piling mat location along S2 and S1 walls will need to be installed to accommodate the arrival of the SF95 CFA piling rigs. The excavation of material and installation of temporary works for the pile mats will be on 3rd party land belonging to the Clayton Hotel and MAG. - Clayton Hotel Wall Removal/Relocation and Reinstatement upon completion. - Remove Fencing - Piling Mat Installation (S1 134m, S2 194m) - Screw Piles - Stone up the area adjacent to the UU area (already deveged) - Install Railway access steps

You might also see

  • All Kier Transportation - CP7 NWC notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
171,540 noticesclosed · sorted by publication date
Page 32 of 8577
Time to close
Value
Type
Buyer
Notice
CLOSED
13 Apr
—
Estimated
Closed
CF
UO
University of Leeds
2024-25/4278a- Supply of a Protein Purification System
Laboratory equipment· Published 12 Mar
CLOSED
11 Mar
—
Estimated
Modification
FTS
TC
The Council of the Borough of Kirklees
Provision of Washroom Services
· Published 11 Mar
CLOSED
11 Mar
—
Estimated
Modification
FTS
TF
Transport for London
Jubilee Line (96TS) - Electro Pneumatic and Butterfly Cock Valves
· Published 11 Mar
CLOSED
11 Mar
—
Estimated
Modification
FTS
FC
Flintshire County Council
Families First- Young Carers with additional needs and/or a disability
· Published 11 Mar
CLOSED
18 Mar
—
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
A66 Northern Trans-Pennine (NTP) - Manned Security
Business services· Published 11 Mar
CLOSED
11 Mar
—
Estimated
Modification
FTS
LB
London Borough Of Islington
2425-0477: Void Reservicing, Refurbishment, and New Tenancy Repair Works
· Published 11 Mar
CLOSED
18 Mar
£75k
Estimated
Closed
CF
KT
KIER TRANSPORTATION LIMITED
M6 Lune Gorge - Scaffold Access Bridge
Construction materials· Published 11 Mar
CLOSED
11 Mar
£435k
Estimated
Closed
CF
LC
Leicestershire County Council
LC17 Wigston - Thorpe Astley
Transport services· Published 11 Mar
CLOSED
27 Mar
—
Estimated
Closed
CF
UC
United Colleges Group
CA17357 - UCG PUBLIC RELATIONS AGENCY SERVICES
Business services· Published 11 Mar
CLOSED
11 Mar
£1.2m
Estimated
Closed
CF
DF
Department for Education
Careers Advisor CPD - Design and Delivery of National Continuing Professional Development Programme
Education & training· Published 11 Mar
CLOSED
10 Apr
£100k
Estimated
Closed
CF
OA
Oil and Pipelines Agency
GB-Campbeltown: OPA T834 OFD Campbeltown Fuel Loading Option Study
Architecture & engineering· Published 11 Mar
CLOSED
26 Mar
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Vehicles
Transport equipment· Published 11 Mar
CLOSED
07 Apr
—
Estimated
Closed
CF
TR
The Royal Borough of Windsor and Maidenhead Council
Open Framework for Provision of Nightly Rate Temporary Accommodation For RBWM
Hotel & restaurant· Published 11 Mar
CLOSED
18 Mar
—
Estimated
Closed
CF
SL
SERCO LIMITED
Welsh Government - Employability Support Programme
Education & training· Published 11 Mar
CLOSED
10 Apr
£4.8m
Estimated
Closed
CF
CC
Cornwall Council
Community Based Out of School Provision
Education & training· Published 11 Mar
CLOSED
01 Apr
—
Estimated
Closed
CF
ME
Maiden Erlegh School
CA17356 - Maiden Erlegh Trust Student Washroom Refurbishment Works
Construction work· Published 11 Mar
CLOSED
17 Mar
£20.0m
Estimated
Closed
CF
UP
Uk Power Networks Services
Airport Civils (Operational Civils)
Construction materials· Published 10 Mar
CLOSED
20 Mar
£2.5m
Estimated
Closed
CF
BB
Balfour Beatty VINCI Systra JV
Traffic Management - Old Oak Common (S4) Station
Transport equipment· Published 10 Mar
CLOSED
01 Apr
—
Estimated
Closed
CF
ME
Maiden Erlegh School
CA17268 - Maiden Erlegh Trust Student Washroom Refurbishment Works
Construction work· Published 10 Mar
CLOSED
07 Apr
£300k
Estimated
Closed
CF
SC
Southampton City Council
Southampton District Christmas Lights
Electrical machinery· Published 10 Mar
Page 32 of 8577
PreviousNext