PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Deadline
  • Any
  • Closing in 24 hours
  • Closing this week
  • Closing this month
  • Closing in 90 days
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
167
New notices
Posted · 30d
6,763
All notice types
Awarded · 7d
864
Market signal

Notice peek

×
CF
TenderFTS · 06c123

CEFAS26-85 ITT for provision of Water and Sediment Sampling Analysis for HPC

CENTRE FOR ENVIRONMENT, FISHERIES AND AQUACULTURE SCIENCE
Closes in
30d
31 Jul 2026
Estimated
£125k
Services
Published
01 Jul 2026

Key facts

Notice ID
ocds-h6vhtk-06c123
CPV code
71354500 · Architecture & engineering
Contract type
services
Source
Find a Tender

Timeline

  1. Published
    01 Jul 2026
  2. Submission deadline
    31 Jul 2026 · 30 days from now

Description

The BEEMS (British EDF Energy Estuarine and Marine Studies) programme is funded by NNB Generation Company (HPC) Limited. Through this programme, Cefas provide authoritative scientific information on the marine and transitional waters in the vicinity of potential new build nuclear power stations and require the Supplier to deliver the marine sampling, profiling, and laboratory analysis services described in Section 3 below. 3. Contract Duration The Contract implementation will start as soon as possible following contract award with the initial Contract period of 12 months, with the option to extend by up to 4 further periods of 12-months each. 4. Scope of Requirements Cefas require the supplier to acquire sediment and water samples along with water column profiles of conductivity, temperature and depth (CTD) and other variables from a suitable vessel for the purpose of physical and chemical monitoring of the marine offshore environment adjacent to the Hinkley Point C new nuclear build power station. It is anticipated that the required sampling will involve circa 3 days of vessel operations – two days for water sampling and one day for sediment sampling. The requirement includes collection of all samples and field measurements and all laboratory sample analysis, excluding hydrazine analysis which is to be conducted by Cefas laboratory. General Survey Strategy: The marine water and sediment sampling survey will be conducted in Bridgwater Bay adjacent to the Hinkley Point C construction site, in summer 2026, with the potential for continued annual sampling for at least 4 years. Water sampling will be carried out over a full tidal cycle at two main locations detailed in the sections below, with a full day dedicated to each location, requiring a minimum of two survey days. Sediment samples will be collected as detailed below and sampling will be conducted on a separate survey day. Suppliers will propose a survey schedule to fulfil the sampling requirements. The survey schedule will be agreed prior to the survey but should be planned to maximise efficiency. At least one month prior to the first survey start date, the supplier will provide a RAMS including a description of the acquisition, storage and shipping, and laboratory analysis requirements of each of the samples. It is anticipated that this will be informed by the analysing laboratory but must be agreed by the Cefas team prior to the survey. Water sampling Water quality samples will be collected repeatedly over a full tidal cycle from a vessel at three stations in the vicinity of the cooling water outfall heads (CWO) and three stations in the vicinity of the fish recovery and return outfall (FRR). The stations are provided in Table 1 and Figure 1. Target station locations have been selected based on modelling outputs and are aligned with tidal currents. Survey logistics, safety measures or ongoing works may require the precise locations to be amended during final survey planning or during the survey. Final target stations and positioning tolerance will be agreed between the supplier and Cefas before the survey during a kick-off meeting. Surveys will be conducted annually in the summer to establish a contemporary baseline prior to the station commencing operation. It is anticipated that each survey will consist of two days of water sampling, one day at the CWO stations and a second at the FRR stations. Water sampling – survey strategy Water samples will be collected from six sampling locations: three close to the CWO, and three close to the FRR (Table 1). At each of these stations, samples will be taken at the surface and near bottom (nominally 0.5 – 1 m of the bed). A multi-parameter sonde (to continuously record salinity, temperature, dissolved oxygen and pH) will be deployed with a niskin bottle (or similar sampling bottle) at each depth and at each station. The vessel will work at one of the locations per day (FRR or CWO) and acquire multiple samples throughout the tidal cycle. So, for example, day one may look like this: FRR A – Profile + surface and near bottom samples – transit to; FRR B – Profile + surface and near bottom samples – transit to; FRR C – Profile + surface and near bottom samples – transit to FRR A and repeat. When the samples are processed, logged and stored the vessel will return to FRR A and start sampling again. This process will continue throughout the day with the aim of gathering as many samples as possible (nominally every hour) within one 12-hour period (time spent on site should be maximised by choosing an appropriate harbour to work from). Hydrazine samples will be analysed by Cefas laboratories and as such, Cefas will provide sampling equipment, including pre-spike sampling contained, and an SOP for collection ahead of the survey. Suppliers should note that hydrazine samples require fixing with hazardous chemical reagents provided (acetone and ethanol spiked with isotopically labelled hydrazine). There is a requirement for measurements of total residual oxidant (TRO) which must be conducted onboard with a colorimetric method and reagent. A CamLab CW1000 colorimeter or equivalent specification will be used, calibrated with a reference standard each day. The detection limit of the TRO test must be at least 0.02 mg/L. Three replicate measurements of TRO are required from each sample. The supplier will undertake this analysis immediately after taking water samples to avoid degradation. Sediment Sampling Sediment will be collected from a vessel at pre-determined (nearfield and control stations) (Table 3 and Figure 2) around the CWO and the FRR outfall. Surveys will be conducted annually to establish a contemporary baseline prior to the operation of the power station. It is anticipated that the sediment sampling will be completed in one day. Sediment sampling – survey strategy Sediment samples will be acquired with a Day grab and samples analysed for: • Trace metals • Particle Size Analysis (PSA) • Total Organic Carbon It is anticipated that sediment will be collected from all 20 stations (Table 3) in one day of survey. Replicate (spare) samples must be acquired at every station (but not analysed unless required). Supplier must obtain a full set of samples (A replicates) from one Day grab, with a second grab deployed at each station to provide a full set of replicate samples (B replicates). The B replicates will be processed and stored appropriately to be analysed only if there is an issue with the replicate A samples. Table 4 provides a list of all determinands which need to be analysed from sediment. Analysis must be completed by a MMO certified laboratory and meet the minimum reporting requirements for each determinand . Samples will be collected using the correct type of cleaned scoop, decanted into appropriate receptacles and frozen / refrigerated all in line with the laboratory’s requirements (agreed with Cefas prior to the survey).

You might also see

  • All CENTRE FOR ENVIRONMENT, FISHERIES AND AQUACULTURE SCIENCE notices →
  • All Architecture & engineering notices →
Open full notice ↗View in this tab
496 noticesopen · sorted by deadline ascending
Page 5 of 25
Time to close
Value
Type
Buyer
Notice
Closing this week20 notices
2d
03 Jul
£438k
Estimated
Tender
FTS · Works
ES
East Staffordshire Borough Council
Design and Installation of a New Greenhouse at Stapenhill Cemetery
Construction materials· Published 04 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
TW
THAMES WATER UTILITIES LIMITED
Bio Recycling
Transport equipment· Published 02 Jun
2d
03 Jul
£300k
Estimated
Tender
FTS · Services
NG
Northampton General Hospital NHS Trust
UHN - Fully Comprehensive Lift Maintenance Contract
Repair & maintenance· Published 04 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
WM
West Midlands Fire and Rescue Authority
Legionella and Water Monitoring Services 2026
Sewage & refuse· Published 04 Jun
2d
03 Jul
£210k
Estimated
Tender
FTS · Services
CY
Comisiynydd y Gymraeg
Gwasanaethau Cefnogi TG / IT Support Services
IT services· Published 04 Jun
2d
03 Jul
£1.0m
Estimated
Tender
FTS · Works
WN
West Northamptonshire Council
Royal and Derngate Theatre Works
Construction work· Published 04 Jun
2d
03 Jul
£45k
Estimated
Below-thresh.
FTS · Services
SH
Surrey Heath Borough Council
Civil Engineering for St Catherine's Wood
Architecture & engineering· Published 04 Jun
2d
03 Jul
£4.0m
Estimated
Tender
FTS · Services
GA
Guy's and St Thomas' NHS Foundation Trust
Lead Architect - Evelina Expansion (Triangle) Design and Fit Out
Architecture & engineering· Published 01 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Works
CH
Citizen Housing Group Ltd
2025 - 1079 Pitched Roofing Upgrade Project at Abberley Close, Redditch
Construction materials· Published 05 Jun
2d
03 Jul
£200k
Estimated
Tender
FTS · Works
WC
Wrexham County Borough Council
Supply and Installation of Esless Lane Cycleway Bridge
Construction work· Published 05 Jun
2d
03 Jul
£500k
Estimated
Tender
FTS · Supplies
SM
Stockport Metropoliton Borough Council
Provision of PPE, Uniform, and Safety Ancillaries
Clothing & footwear· Published 05 Jun
2d
03 Jul
£400k
Estimated
Tender
FTS · Services
TN
The Newcastle Upon Tyne Hospitals NHS Foundation Trust
Approved Dosimetry Services
Sewage & refuse· Published 05 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
PF
Police, Fire & Crime Commissioner for Staffordshire
Provision of a Vehicle Recovery and Roadside Assistance Service
Repair & maintenance· Published 05 Jun
2d
03 Jul
£1.4m
Estimated
Tender
FTS · Works
LB
London Borough of Sutton
Provision of Carshalton and Clockhouse Retrofit Works (Sutton Housing Partnership)
Construction work· Published 05 Jun
2d
03 Jul
£38k
Estimated
Below-thresh.
FTS · Works
NE
North East Derbyshire District Council
Longcroft Close Play Area
Musical instruments· Published 29 May
2d
03 Jul
£54.0m
Estimated
Tender
FTS · Services
NI
Northern Ireland Water Limited
T141 - Electrical, Instrumentation, Control and Automation, Installation, Repair and Maintenance
Repair & maintenance· Published 05 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
DC
Derry City and Strabane District Council
T26-060CRO Restricted List Application for Health and Safety Training Providers
Education & training· Published 28 May
2d
03 Jul
£100k
Estimated
Tender
FTS · Works
NE
North East Derbyshire District Council
Boiler Plant Replacement, PV Installation & Associated Works at Coney Green Business Centre, Wingfield View, Clay Cross, Chesterfield, S45 9JW
Furniture & furnishings· Published 28 May
2d
03 Jul
£2.8m
Estimated
Tender
FTS · Services
CG
Coleg Gwent
260 - HR Recruitment Agency Framework Tender.
Business services· Published 26 May
2d
03 Jul
—
Estimated
Tender
FTS · Works
YP
Yorkshire Purchasing Organisation
National Framework for Developer-Led Schemes
Construction work· Published 11 May
Page 5 of 25
PreviousNext