PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
235
New notices
Posted · 30d
12,643
All notice types
Awarded · 7d
1,579
Market signal

Notice peek

×
AJ
ClosedCF · 120c0527d8cd

Building Management System - North and South Portals at Old Oak Common (Tender Ref: COMM12)

Anthro JV
Status
Closed
Estimated
£1.0m
Published
10 Dec 2025

Key facts

Notice ID
cf-ea5099d9-7121-4a51-ad94-120c0527d8cd
CPV code
71320000 · Architecture & engineering
Source
Contracts Finder

Timeline

  1. Published
    10 Dec 2025

Description

Overview of the requirement: HS2 Old Oak Common (OOC) is a new high-speed rail station being built as part of the High Speed 2 (HS2) project - the UK's flagship rail infrastructure initiative. Once constructed Old Oak Common will be the largest newly built station in the UK. A key interchange between HS2, Elizabeth Line, Great Western Railway (GWR), and Heathrow Express services. Situated in West London, between North Acton and Willesden Junction and built on the site of the former Old Oak Common Railway depot. HS2 station will provide six high-speed Sub-surface platforms and eight conventional surface platforms for Great Western Main Line services (GWML) the combined station design will handle up to 250,000 passengers per day. The Euston Tunnel North Portal and OOC Tunnel South Portal buildings form part of the wider Old Oak Common Railway Station, providing the physical civil connection between tunnels and station constructed box, it also provides space for equipment. The design of the BMS for the portals is based on HS2 Technical Standard, Shaft and Portal Building Communications and Building Management Systems, this document will be provided with the ITT pack. The North and South Portal Buildings will operate a standalone Building Management System (BMS) dedicated to the Portal MEPH systems. The Portals BMS shall be designed to monitor and control only those assets designated as in-scope for the Portals in the applicable HS2 standards, the WSP RIBA 4(ii) design, and the Employer's Requirements, and shall not assume responsibility for any third-party systems outside this definition. The portals independent BMS shall be designed to monitor and manage the Portal building MEP systems. The East (North) and West (South) Portals BMS shall act as the central point for acquisition of asset performance data for analytical evaluation of equipment performance locally, asset maintenance and override for testing and maintenance purposes via access from NICC. The Portals BMS shall have a central PLC based system for control and monitoring of the designated Portal Equipment. All control logic shall be in the central PLC's, and all plant will use Remote Input/Output (RIO) units to interface with the field equipment. An exception to this will be life safety systems which will have their own redundant PLCs. All the field BMS outstations (RIO's) shall be connected in a fibre ring topology with the central PLC system. The BMS Subsubcontractor shall be suitable qualified with a proven record of accomplishment in delivering design, Installation and commissioning complex BMS systems in a railway environment, integrating a full suite of mechanical, electrical, HVAC, Drainage, Fire systems, and telecommunication systems.

You might also see

  • All Anthro JV notices →
  • All Architecture & engineering notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 85 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
22 Dec
—
Estimated
Closed
CF
EK
East Kent Hospitals University NHS Foundation Trust
Ambient Voice Technology
Software packages· Published 05 Dec
CLOSED
05 Jan
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1879-T-TH Business Analyst and Improvement Specialist/Leader Apprenticeships
Education & training· Published 05 Dec
CLOSED
05 Jan
£100k
Estimated
Closed
CF
LL
Leighton Linslade Town Council
Play Safety Surfaces Refurbishment
Repair & maintenance· Published 05 Dec
CLOSED
12 Jan
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1880-T-SK - Translation and Interpretation Services
Business services· Published 05 Dec
CLOSED
07 Jan
—
Estimated
Closed
CF
SC
Sparsholt College Hampshire
CA16386 - Sparsholt College Group - Mechanical Maintenance Services
Repair & maintenance· Published 05 Dec
CLOSED
19 Dec
£846k
Estimated
Closed
CF
PC
Peterborough City Council
Direct Payment Support Service
Health & social· Published 05 Dec
CLOSED
17 Dec
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
RFI - Advanced Penetration Testing and Forensic Analysis enquiry for Cyber Risk Assurance
IT services· Published 05 Dec
CLOSED
09 Jan
—
Estimated
Closed
CF
AN
Advance Northumberland Limited
Ascent Homes - Moorside - Plot Groundworks
Construction work· Published 04 Dec
CLOSED
04 Mar
£353k
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Belmont Park PRU E10 - Renewal of Roof Coverings
Construction work· Published 04 Dec
CLOSED
19 Dec
—
Estimated
Closed
CF
BB
Burnley Borough Council
Dog Kennelling Services, Burnley
Other services· Published 04 Dec
CLOSED
10 Dec
—
Estimated
Closed
CF
CO
COLLEGE OF POLICING LIMITED
Provision of Articulate Licenses
Software packages· Published 04 Dec
CLOSED
17 Dec
£5.0m
Estimated
Closed
CF
TP
The Parochial Church Council (PCC) of St Andrew's Church
GB-London: Repairs to the Spire at St Andrew's Church, Thornhill Square, London, N1 1BQ
Construction work· Published 04 Dec
CLOSED
16 Dec
—
Estimated
Closed
CF
ES
Epsom & St Helier University Hospitals NHS Trust
CA16839 - R5903 EGH - Upgrade MRI Scissor Lift
Construction work· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
02 Jan
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4912.EFM.SW.25 Arts Tower - Levels 1,2,3 and 7 Refurbishment
Construction work· Published 04 Dec
CLOSED
26 Dec
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Back-loading Garbage Trucks
Industrial machinery· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
05 Jan
£100.0m
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
GB-Romford: YMCA Thames Gateway - 2026 Development
Construction work· Published 04 Dec
CLOSED
07 Jan
£500k
Estimated
Closed
CF
UO
University of Leeds
GB-Leeds: 2025/26-5283- Supply of a High Temperature Simultaneous Thermal Analysis system with MS detector
Laboratory equipment· Published 04 Dec
CLOSED
04 Dec
—
Estimated
Modification
FTS
CL
Central London Community Healthcare NHS Trust
CLCH Sleep Studies and Ongoing Patient Care
· Published 04 Dec
Page 85 of 8261
PreviousNext