PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
341
New notices
Posted · 30d
12,374
All notice types
Awarded · 7d
1,574
Market signal

Notice peek

×
BT
ClosedCF · 356cec7dd040

Conversion of Existing Storage Unit to Public Toilet Facility

Broseley Town Council
Status
Closed
Estimated
—
Published
23 Feb 2026

Key facts

Notice ID
cf-b3fdb424-29e2-4245-8457-356cec7dd040
CPV code
45111240 · Construction work
Source
Contracts Finder

Timeline

  1. Published
    23 Feb 2026

Description

1. Introduction Broseley Town Council invites suitably qualified and experienced contractors to submit a tender for the conversion of an existing storage unit into upgraded toilet facilities within the cemetery grounds. The Council is content in principle to proceed with the works, subject to confirmation that all required elements are included within the quoted costs and that full compliance documentation is provided. ________________________________________ 2. Scope of Works The works shall include, but not be limited to, the following: A. External & Enabling Works 1. Traffic management arrangements. 2. Council fees for any required road closures. 3. Severn Trent connection fees (where applicable). 4. Road and ground reinstatement to existing conditions. B. Drainage & Groundworks 5. Installation of foul drainage pipe from the toilet block to the main sewer in the main road, including: o Excavation of trench o Supply and installation of gravel bedding o Pipework and fittings o Installation of manholes (as required) o Reinstatement to current ground conditions 6. Foul pipework from toilet and basin to external drainage system. C. Plumbing & Sanitary Installation 7. Supply and installation of toilet and hand basin. 8. Water connections to toilet and basin. 9. Plumbing in of water supply to the new toilet and sink. D. Internal Alterations • Alterations necessary to convert storage unit to compliant toilet facility. • Compliance with current Building Regulations and water authority requirements. • Provision of adequate ventilation and welfare compliance where applicable. ________________________________________ 3. Contractor Requirements The successful contractor must act as Principal Contractor and demonstrate compliance with the Construction (Design and Management) Regulations 2015 (CDM 2015). Tender submissions must include: A. Health & Safety Documentation • Confirmation of Principal Contractor compliance with CDM 2015 • Construction Phase Health & Safety Plan (CPP), outlining: o Site risk management o Welfare arrangements o Sequencing of works o Site control and public protection measures • RAMS (Risk Assessments and Method Statements) relevant to all aspects of the works. B. Insurance • Public Liability Insurance (minimum £5 million or as specified) • Employers' Liability Insurance • Professional Indemnity Insurance (if applicable) C. Accreditation & Certification • Relevant trade certifications • Operative tickets (e.g., CPCS/NPORS for plant, confined space where required) • Evidence of competency for drainage and water connections D. Programme of Works • Detailed programme/time plan outlining: o Proposed commencement date (from 1 April, subject to agreement) o Key milestones o Anticipated duration o Sequencing of works ________________________________________

You might also see

  • All Broseley Town Council notices →
  • All Construction work notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 85 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
22 Dec
—
Estimated
Closed
CF
EK
East Kent Hospitals University NHS Foundation Trust
Ambient Voice Technology
Software packages· Published 05 Dec
CLOSED
05 Jan
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1879-T-TH Business Analyst and Improvement Specialist/Leader Apprenticeships
Education & training· Published 05 Dec
CLOSED
05 Jan
£100k
Estimated
Closed
CF
LL
Leighton Linslade Town Council
Play Safety Surfaces Refurbishment
Repair & maintenance· Published 05 Dec
CLOSED
12 Jan
—
Estimated
Closed
CF
CB
Central Bedfordshire Council
CBC-1880-T-SK - Translation and Interpretation Services
Business services· Published 05 Dec
CLOSED
07 Jan
—
Estimated
Closed
CF
SC
Sparsholt College Hampshire
CA16386 - Sparsholt College Group - Mechanical Maintenance Services
Repair & maintenance· Published 05 Dec
CLOSED
19 Dec
£846k
Estimated
Closed
CF
PC
Peterborough City Council
Direct Payment Support Service
Health & social· Published 05 Dec
CLOSED
17 Dec
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
RFI - Advanced Penetration Testing and Forensic Analysis enquiry for Cyber Risk Assurance
IT services· Published 05 Dec
CLOSED
09 Jan
—
Estimated
Closed
CF
AN
Advance Northumberland Limited
Ascent Homes - Moorside - Plot Groundworks
Construction work· Published 04 Dec
CLOSED
04 Mar
£353k
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Belmont Park PRU E10 - Renewal of Roof Coverings
Construction work· Published 04 Dec
CLOSED
19 Dec
—
Estimated
Closed
CF
BB
Burnley Borough Council
Dog Kennelling Services, Burnley
Other services· Published 04 Dec
CLOSED
10 Dec
—
Estimated
Closed
CF
CO
COLLEGE OF POLICING LIMITED
Provision of Articulate Licenses
Software packages· Published 04 Dec
CLOSED
17 Dec
£5.0m
Estimated
Closed
CF
TP
The Parochial Church Council (PCC) of St Andrew's Church
GB-London: Repairs to the Spire at St Andrew's Church, Thornhill Square, London, N1 1BQ
Construction work· Published 04 Dec
CLOSED
16 Dec
—
Estimated
Closed
CF
ES
Epsom & St Helier University Hospitals NHS Trust
CA16839 - R5903 EGH - Upgrade MRI Scissor Lift
Construction work· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
02 Jan
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4912.EFM.SW.25 Arts Tower - Levels 1,2,3 and 7 Refurbishment
Construction work· Published 04 Dec
CLOSED
26 Dec
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Back-loading Garbage Trucks
Industrial machinery· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
05 Jan
£100.0m
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
GB-Romford: YMCA Thames Gateway - 2026 Development
Construction work· Published 04 Dec
CLOSED
07 Jan
£500k
Estimated
Closed
CF
UO
University of Leeds
GB-Leeds: 2025/26-5283- Supply of a High Temperature Simultaneous Thermal Analysis system with MS detector
Laboratory equipment· Published 04 Dec
CLOSED
04 Dec
—
Estimated
Modification
FTS
CL
Central London Community Healthcare NHS Trust
CLCH Sleep Studies and Ongoing Patient Care
· Published 04 Dec
Page 85 of 8261
PreviousNext