PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
213
New notices
Posted · 30d
12,196
All notice types
Awarded · 7d
1,494
Market signal

Notice peek

×
KI
ClosedCF · 446a93fdb489

Oldfield Road - E & P Works

Kier Infrastructure and Overseas - CP7 NWC
Status
Closed
Estimated
£1.0m
Published
22 Oct 2025

Key facts

Notice ID
cf-29b7a069-e1a4-4fad-85ee-446a93fdb489
CPV code
31518000 · Electrical machinery
Source
Contracts Finder

Timeline

  1. Published
    22 Oct 2025

Description

This is an enhancement scheme funded by the DfT and is part of a package of proposed measures in the Manchester area that are planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. The scheme is for the design and delivery of an East facing turnback, located on the Manchester, Bolton and Bury Line (ELR: MVE1) adjacent to the existing Salford Hope Street (Cemex) sidings between Salford Central Station and the Oldfield Road Bridge. At Victoria Station, the through platforms also accommodate terminating trains. The extended time to terminate and turnback in the platforms restricts platform availability for through services. The provision of the turnback siding will allow terminating services from the East arriving at Victoria to clear the platform, travel to the turnback siding and await their next turn of duty, clear of the station. There is the further benefit of an additional stop at Salford Central Station for passengers to disembark for Manchester Spinningfields, a major employment location in the city centre. The turnback would also act as a service recovery measure during times of service perturbation. The turnback is to consist of two roads, to accommodate trains up to 8 car x 24m in one road and 6 car x 24m in a second road; with access to and from platforms 3-6 at Manchester Victoria via existing connections. The new east facing turnback shall also be able to operate as a berthing/storage siding, with walking routes to allow train crew to access and egress the railway. The turnback will be fully electrified at 25kV and be fully signalled as a route for planned, rather than simply emergency, usage. The supply, installation, testing and commissioning of the point heating system. This includes, but is not limited to: Mains Distribution equipment, 230v and 110v LV cabling, Heater strips, Heat retainers, Clamp lock heaters, TCBs', PHT's and associated controls.

You might also see

  • All Kier Infrastructure and Overseas - CP7 NWC notices →
  • All Electrical machinery notices →
Open full notice ↗View in this tab
165,209 noticesclosed · sorted by publication date
Page 86 of 8261
Time to close
Value
Type
Buyer
Notice
CLOSED
19 Dec
£846k
Estimated
Closed
CF
PC
Peterborough City Council
Direct Payment Support Service
Health & social· Published 05 Dec
CLOSED
17 Dec
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
RFI - Advanced Penetration Testing and Forensic Analysis enquiry for Cyber Risk Assurance
IT services· Published 05 Dec
CLOSED
09 Jan
—
Estimated
Closed
CF
AN
Advance Northumberland Limited
Ascent Homes - Moorside - Plot Groundworks
Construction work· Published 04 Dec
CLOSED
04 Mar
£353k
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Belmont Park PRU E10 - Renewal of Roof Coverings
Construction work· Published 04 Dec
CLOSED
19 Dec
—
Estimated
Closed
CF
BB
Burnley Borough Council
Dog Kennelling Services, Burnley
Other services· Published 04 Dec
CLOSED
10 Dec
—
Estimated
Closed
CF
CO
COLLEGE OF POLICING LIMITED
Provision of Articulate Licenses
Software packages· Published 04 Dec
CLOSED
17 Dec
£5.0m
Estimated
Closed
CF
TP
The Parochial Church Council (PCC) of St Andrew's Church
GB-London: Repairs to the Spire at St Andrew's Church, Thornhill Square, London, N1 1BQ
Construction work· Published 04 Dec
CLOSED
16 Dec
—
Estimated
Closed
CF
ES
Epsom & St Helier University Hospitals NHS Trust
CA16839 - R5903 EGH - Upgrade MRI Scissor Lift
Construction work· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
02 Jan
—
Estimated
Closed
CF
UO
UNIVERSITY OF SHEFFIELD
4912.EFM.SW.25 Arts Tower - Levels 1,2,3 and 7 Refurbishment
Construction work· Published 04 Dec
CLOSED
26 Dec
—
Estimated
Closed
CF
CI
Chemonics International, Inc.
Procurement of Back-loading Garbage Trucks
Industrial machinery· Published 04 Dec
CLOSED
08 Sept
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
Project: 712822452 - Programme Cameron TSP RIBA 1-3
Architecture & engineering· Published 04 Dec
CLOSED
05 Jan
£100.0m
Estimated
Closed
CF
BS
BIP SOLUTIONS LIMITED
GB-Romford: YMCA Thames Gateway - 2026 Development
Construction work· Published 04 Dec
CLOSED
07 Jan
£500k
Estimated
Closed
CF
UO
University of Leeds
GB-Leeds: 2025/26-5283- Supply of a High Temperature Simultaneous Thermal Analysis system with MS detector
Laboratory equipment· Published 04 Dec
CLOSED
04 Dec
—
Estimated
Modification
FTS
CL
Central London Community Healthcare NHS Trust
CLCH Sleep Studies and Ongoing Patient Care
· Published 04 Dec
CLOSED
16 Jan
—
Estimated
Closed
CF
HW
Harmony Works Trust
Harmony Works, Canada House
Construction work· Published 03 Dec
CLOSED
03 Dec
—
Estimated
Closed
FTS · Services
WL
West Lothian Council
Complex Package of Care
Other services· Published 03 Dec
CLOSED
03 Dec
—
Estimated
Modification
FTS
NA
Newark And Sherwood District Council
NSDC-1003 Ollerton Town Centre Cinema Fit Out and Operator
· Published 03 Dec
CLOSED
07 Jan
£92k
Estimated
Closed
CF
NA
NHS Arden and Greater East Midlands Commissioning Support Unit
2016 NICOR Java Developer for NHS Arden & GEM CSU
Business services· Published 03 Dec
CLOSED
12 Dec
—
Estimated
Closed
CF
NE
North East London NHS Foundation Trust (NELFT)
RA355055 - Recruitment Consultant Support for Non-Executive Directors
Business services· Published 03 Dec
Page 86 of 8261
PreviousNext