PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices
BuyersSuppliersNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Outcome
  • All
  • Awaiting award
  • Cancelled
  • Withdrawn
  • Unsuccessful
Closed since
  • Any
  • Closed ≤ 30 days
  • Closed ≤ 90 days
  • Closed ≤ 12 months
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
ActiveView: Closed×Clear all
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
167
Open notices
Closing this week
492
Don’t miss
Open · all
2,978
Live opportunities
Posted · 24h
376
New notices
Posted · 30d
12,774
All notice types
Awarded · 7d
1,943
Market signal

Notice peek

×
BB
ClosedCF · 4e080514de72

A66 - Sheet Piles

BALFOUR BEATTY CIVIL ENGINEERING LIMITED
Status
Closed
Estimated
—
Published
20 Feb 2026

Key facts

Notice ID
cf-d01423b9-4a9c-4c91-805d-4e080514de72
CPV code
44212410 · Construction materials
Source
Contracts Finder

Timeline

  1. Published
    20 Feb 2026

Description

1. Overview The works comprise the supply and installation of steel sheet piling to support temporary and permanent structures across the A66 NTP Project, BBA Section 3b. 2. Detailed Scope 2.1 Supply of Materials The Contractor shall supply: • Steel sheet piles in various profile sizes, complete with corrosion protection and cut to length requirements. 2.2 Installation of Sheet Piles The Contractor shall undertake: • Pile installation works including driving, vibration, pre drilling, cutting, interlock connections, tie rods, waling and bracing systems. • Removal of sheet piles upon completion of works. 2.3 Associated Works The Contractor shall complete associated activities including: • Pile guide frames • Dewatering screens • Structural support components 2.4 Pre Construction & Site Activities Activities include: • Mobilisation and site establishment • Setting out • QA testing • Preparation of record drawings and certification 2.5 Coordination Requirements The Contractor shall coordinate with related project disciplines including foundations, drainage and earthworks teams. ________________________________________ 3. Standards & Compliance All works must be carried out in accordance with: • BD 21/01 • National Highways Specification • Relevant BS/EN/Eurocode standards • CDM Regulations ________________________________________ 4. Key Supplier Requirements The Contractor must: • Demonstrate capability to manage CDM and SHES risks • Provide method statements, vibration and noise mitigation plans • Coordinate closely with Temporary Works Designers • Collaborate with the Balfour Beatty site and engineering teams • Submit all required QA documentation, including testing and certification evidence ________________________________________ 5. Procurement & Delivery Model (Informational Context Only) A competitive tender process will be conducted to select a single supply and install partner for consistency, scalability and value. (You can exclude this section if you only need the technical scope.) ________________________________________ 6. Risks & Mitigation - Contractor Responsibilities The Contractor shall support risk management in areas including: • Early award and resource confirmation to reduce over commitment risks • Managing vibration and settlement risks through pre condition surveys and real time monitoring • Mitigating design or construction clashes through integrated design reviews and 3D coordination • Minimising traffic management delays via advanced planning and flexible work slots • Managing steel/fuel cost volatility through early procurement and index linked pricing mechanisms ________________________________________ 7. Deliverables The Contractor shall provide: • Complete installation of specified sheet piling works • Full QA documentation including test results and certification • As built / record drawings

You might also see

  • All BALFOUR BEATTY CIVIL ENGINEERING LIMITED notices →
  • All Construction materials notices →
Open full notice ↗View in this tab
175,267 noticesclosed · sorted by publication date
Page 312 of 8764
Time to close
Value
Type
Buyer
Notice
CLOSED
28 Feb
£21k
Estimated
Closed
CF
NM
Newry, Mourne and Down District Council (NMD)
CA15346 - RFQ 2024/34 - Tree Planting Works District Wide in Parks & Amenity Locations
Agriculture & forestry· Published 18 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
UO
University of Bath
Versatile Ultra-High Speed Camera
Laboratory equipment· Published 18 Feb
CLOSED
20 Mar
—
Estimated
Closed
CF
LB
London Borough of Waltham Forest
Mechanical and Electrical Services
Architecture & engineering· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
CF
AD
AMEY DEFENCE SERVICES LIMITED
FDIS - Wittering External Refurbishments to 45 properties - FY2025/26 - Amey Central Region - East Midlands & Nth
Construction work· Published 18 Feb
CLOSED
14 Apr
£396k
Estimated
Closed
CF
SC
Suffolk County Council
Catering Services for Melton Primary School
Hotel & restaurant· Published 18 Feb
CLOSED
20 Mar
£150k
Estimated
Closed
CF
BP
Bedfordshire Police; Cambridgeshire Constabulary; Hertfordshire Constabulary
Custody Laundry Service - BCH
Other services· Published 18 Feb
CLOSED
19 Mar
—
Estimated
Closed
CF
SC
Sunderland City Council
First Tier Level: Welfare Rights & Financial Wellbeing Advice
Health & social· Published 18 Feb
CLOSED
21 Mar
£400k
Estimated
Closed
CF
SM
Science Museum Group
L2 Hangar Door Replacement
Construction work· Published 18 Feb
CLOSED
25 Mar
£19.5m
Estimated
Closed
CF
NE
NHS England
NHS National Generic Pharmaceuticals - Clozapine
Medical equipment· Published 18 Feb
CLOSED
13 Feb
—
Estimated
Closed
CF
LC
Leicester City Council
36031 - NETHERHALL
Transport services· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
FTS · Services
RC
Royal Cornwall Hospitals Trust
NHS2305 - Haematology and Oncology Supportive Services
Health & social· Published 18 Feb
CLOSED
28 Feb
—
Estimated
Closed
CF
NA
Norfolk and Norwich University Hospitals NHS Foundation Trust
Syringe Driver Tracking
Medical equipment· Published 18 Feb
CLOSED
13 Mar
—
Estimated
Closed
CF
BC
BRITISH COUNCIL(THE)
2025 DPS PTP APTIS ESOL North cluster
Education & training· Published 18 Feb
CLOSED
03 Jul
—
Estimated
Closed
CF
MO
Ministry of Defence, DIO,
OI/0094 - Field Electrical Power Supplies - Support (FEPS-S) ITT TRANSPARENCY
Repair & maintenance· Published 18 Feb
CLOSED
24 Mar
—
Estimated
Closed
CF
SR
South Ribble Borough Council
School Swimming Transport Services
Transport services· Published 18 Feb
CLOSED
21 Mar
—
Estimated
Closed
CF
ME
Marlow Education Trust
Marlow Education Trust ~ Cleaning Tender
Sewage & refuse· Published 18 Feb
CLOSED
11 Apr
—
Estimated
Closed
CF
LB
London Borough of Sutton
Accommodation Based Care Flexible DPS - Approved Provider (Adults)
Health & social· Published 18 Feb
CLOSED
20 Mar
£65k
Estimated
Closed
CF
UO
UNIVERSITY OF LANCASTER
Cryosystem for XRD
Laboratory equipment· Published 18 Feb
CLOSED
18 Mar
£600k
Estimated
Closed
CF
MA
Medicines and Healthcare Products Regulatory Agency
Servicing of Air Conditioning Systems, Cold Rooms and Water Chiller Systems
Repair & maintenance· Published 18 Feb
CLOSED
18 Feb
—
Estimated
Closed
CF
IO
Isle of Wight Council
FUTURE OPPORTUNITY Greenmount Primary School - Drainage scheme on the playing field
Construction work· Published 18 Feb
Page 312 of 8764
PreviousNext