PS.
PublicSupply
account_balanceBuyersbusinessSuppliersdescriptionNotices

Procurement notices · Find a Tender + Contracts Finder

Notices

Every UK public-sector procurement notice in one board — open opportunities, closed tenders, awards, and pre-market signals. Filter by deadline, value or CPV, and save your search as an alert.

FiltersReset all
Quick views
  • All open noticesLive opportunities
  • Closing today / tomorrow
  • Closing this week
  • Newly published (24h)
  • High value (£10m+)
  • Awards · last 7 daysMarket signal
  • Pre-market signalsFuture procurements
  • Recently closedAwaiting outcome
  • All noticesEvery PA23 type
Type
  • All
  • Services
  • Supplies
  • Works
Deadline
  • Any
  • Closing in 24 hours
  • Closing this week
  • Closing this month
  • Closing in 90 days
Value
  • Any
  • £100k+
  • £1m+
  • £10m+
  • £100m+
Published
  • Any
  • Last 24 hours
  • Last 7 days
  • Last 30 days
Category
  • All categories
  • IT services
  • Software packages
  • Business services
  • Health & social
  • Construction work
  • Medical equipment
  • Architecture & engineering
  • Repair & maintenance
  • Financial services
  • Education & training
verified_userData sourced from Contracts Finder, Find a Tender, and Companies House.
Contracts Finder ↗Find a Tender ↗Procurement Act 2023 ↗
Closing 24h
4
Open notices
Closing this week
5
Don’t miss
Open · all
70,824
Live opportunities
Posted · 24h
203
New notices
Posted · 30d
6,879
All notice types
Awarded · 7d
894
Market signal

Notice peek

×
LL
TenderFTS · 06a32b

For the provisions of Mobile Plant RRC's

LondonEnergy Ltd
Closes in
25d
25 Jul 2026
Estimated
£750k
Services
Published
30 Jun 2026

Key facts

Notice ID
ocds-h6vhtk-06a32b
CPV code
34000000 · Transport equipment
Contract type
services
Source
Find a Tender

Timeline

  1. Published
    30 Jun 2026
  2. Submission deadline
    25 Jul 2026 · 25 days from now

Description

Lot 1 Requirements for mobile plants at LondonEnergy RRC's: All mobile plants must meet waste specification requirements. All Mobile Plants are to be fitted with the following: Reversing/CCTV camera. (There are several systems commonly used to improve all round visibility not just reversing, please detail what your system will provide and how it meets industry best practise.) Amber warning beacon, green seat belt warning light, audible reversing warning & standard reversing lights, red seat belts. An automated engine cut off that shall activate with prior warning if the plant is left in idle mode for a duration longer than 3 minutes. Air pre-cleaner (preferably cyclone type) and HEPA 0.3 micron cab filters (or better) to deal with dusty working environment. When proposing the type of filters suppliers must take into account the environment and potential Biohazards; please detail what levels of protection the filters will give and the WEL rating. LEL actively encourage suppliers to visit each site to view the operation and confirm if the systems specify will meet or exceed the needs of each mobile plant item. Windscreen cage protection to be fitted to fully protect the operator from debris falling from the bucket whilst maintaining maximum all-round visibility and should be hinged to allow for access to clean glazing. Auto-lube on board dispenser for difficult to access greasing points, manual lubrication to ground standing operator greasing points. To have restricted access to gear selection (1st & 2nd only) or a speed limiter set to a maximum of 10MPH. On-board automated fire suppression system to tackle both engine fires and fires around the bodywork of the mobile plant A separate cost for a 12-volt electrical supply to be fitted to operator cabs should be supplied if the plant specified does not have this as standard, this shall allow for retro installation/fitting of LEL owned radio equipment by LEL or their agents. Anti-theft devices Additional guarding around hydraulic hoses to minimise risk of wear and tear when in contact with waste. All plants must work in all weather conditions, specifically dusty, hot, and humid atmospheres , please reference any specific items such as wide core radiators and/or reversing radiator fan cooling systems that are fitted to all mobile plants being specified by yourselves. All mobile plant must be suitable for working outside continuously. LEL reserve the right to install proximity sensors or any other H&S equipment on the machines supplied, prior notification will be provided. 5 (6) x material handling machines (Equivalent to LH 18 M Liebherr) Fitted with a suitable waste rehandling grab or their equivalent. Supplied on solid tyres. Rehandling grab to be supplied with 40mm thickness one piece wear edge sets. The engineering specification and source of manufacture is to be supplied to LEL. Waste rehandling grab to be configured to have the open/close and rotation circuits operated by foot pedals on the 3rd line circuit and not electrical switching on the joystick handles. The open/close to be on the right-hand pedal with a backward movement to close and forward to open configuration. The rotation on the left-hand pedal with a clockwise rotation in forward position and anticlockwise in the backward position. Grab to be permanently fitted to the dipper arm, quick hitch systems are not required. To be fitted with long arms. To be fitted with machine stabilisers To have a raising cab Estimated usage per annum is 1400hrs (+/- 10%). Lot 2 Maintenance includes: - Servicing - Electrical upgrades - Contractor to manage servicing and planned maintenance, but LEL need to know 14 days in advance in order to plan the operation around down-time. - Replacement machinery is to be provided if it is to be out of service for longer than 24hrs due to parts or engineer availability - Replacement machinery is to be provided if it is required to be taken off site for repairs/maintenance for longer than 24hrs. Alternatively, haulage provided to move a piece of mobile plant from one site to another if in agreement with LEL and is operational suitable. Wear & tear to be included in contract Lot 3 Maintenance includes: - Tyres - Tail blades - There must be service for reactive maintenance 7 days a week, incl. plant break-down and attendance within 90mins of fault notification. - All repairs are to be completed during site operational hours (08:30-16:30 Monday-Sunday) -

You might also see

  • All LondonEnergy Ltd notices →
  • All Transport equipment notices →
Open full notice ↗View in this tab
496 noticesopen · sorted by deadline ascending
Page 7 of 25
Time to close
Value
Type
Buyer
Notice
Closing this week20 notices
2d
03 Jul
—
Estimated
Tender
FTS · Services
DW
Dorset & Wiltshire Fire and Rescue Authority
Asbestos Surveys and Hosting 2026
Architecture & engineering· Published 12 Jun
2d
03 Jul
£104k
Estimated
Tender
FTS · Services
NP
Neath Port Talbot County Borough Council
Holiday Playworks for Neath Port Talbot County Borough Council
Hotel & restaurant· Published 12 Jun
2d
03 Jul
£320k
Estimated
Tender
FTS · Services
PB
Prifysgol Bangor / Bangor University
Bangor University Tender for the Supply & Installation of a Building Management System
Installation services· Published 28 May
2d
03 Jul
—
Estimated
Tender
FTS · Services
PC
Portsmouth City Council
Portsmouth Advice Service
Health & social· Published 27 May
2d
03 Jul
£300k
Estimated
Tender
FTS · Works
BM
Barnsley Metropolitan Borough Council
Princess Street & Longsight Road Damp Remedial Works
Construction work· Published 02 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
EH
Encircle Housing
Concierge Service - Encircle Housing
Business services· Published 29 May
2d
03 Jul
£210k
Estimated
Tender
FTS · Services
CY
Comisiynydd y Gymraeg
Gwasanaethau Cefnogi TG / IT Support Services
IT services· Published 29 May
2d
03 Jul
—
Estimated
Tender
FTS · Services
DC
Durham County Council
Weighbridge Test Unit Hire up to 44,000 kg
Architecture & engineering· Published 01 Jun
2d
03 Jul
£1.6m
Estimated
Tender
FTS · Services
FC
Flintshire County Council
Lleoliad a chymorth Unigol (IPS) Cysylltu â Gwaith ar gyfer Cyngor Sir y Fflint / Connect to work Individual Placement and support (IPS) for Flintshire County Council
Education & training· Published 03 Jun
2d
03 Jul
£40.0m
Estimated
Tender
FTS · Services
LA
LEIGH ACADEMIES TRUST
LAT - Energy Advisor and Procurement Services Consultant Framework
Architecture & engineering· Published 03 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Works
DC
Derry City and Strabane District Council
T25-189CAP Pool Lighting Upgrade Contractors Combined PQQ ITT
Construction work· Published 03 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
WM
West Midlands Fire and Rescue Authority
Legionella and Water Monitoring Services 2026
Sewage & refuse· Published 03 Jun
2d
03 Jul
—
Estimated
Tender
FTS · Services
KH
Knowes Housing Association Ltd.
Knowes Housing Association Ltd. Common Area Cleaning, Various Locations, Faifley
Sewage & refuse· Published 02 Jun
2d
03 Jul
£300k
Estimated
Tender
FTS · Services
NG
Northampton General Hospital NHS Trust
UHN - Fully Comprehensive Lift Maintenance Contract
Repair & maintenance· Published 04 Jun
2d
03 Jul
£256k
Estimated
Tender
FTS · Services
WN
West Northamptonshire Council
WNC Bar and Catering Concessions Contracts - Lot 1 Bar & Alcohol and Lot 2 Christmas Parties
Hotel & restaurant· Published 04 Jun
2d
03 Jul
£490k
Estimated
Tender
FTS · Supplies
BC
Betsi Cadwaladr University Health Board
BCU-FTS-63075 - VIDEO CONFERENCING EQUIPMENT, SUPPORT & MAINTENANCE
Radio & TV equipment· Published 04 Jun
2d
03 Jul
£450k
Estimated
Tender
FTS · Services
LU
Loughborough University
Delivery of VTCT Level 7 Diploma in Applied Financial Trading
Education & training· Published 01 Jun
2d
03 Jul
£15.0m
Estimated
Tender
FTS · Supplies
EO
East Of England NHS Collaborative Hub
EoECPH Aseptic Cleanroom Consumables and Laundry Services.
Medical equipment· Published 01 Jun
2d
03 Jul
£210k
Estimated
Tender
FTS · Services
CY
Comisiynydd y Gymraeg
Gwasanaethau Cefnogi TG / IT Support Services
IT services· Published 01 Jun
2d
03 Jul
£208k
Estimated
Tender
FTS · Supplies
RW
Royal Welsh College of Music and Drama
LED Production Lighting
Electrical machinery· Published 05 Jun
Page 7 of 25
PreviousNext